GTR 103699104

Tenders Are Invited For Construction Of Separate Sections Of Energy-Saving Road Lighting Lines In The Tarnowiec Commune - 2025.

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
103699104
Tendering Authority
Subscribe to view
Tender No
WG.271.1.22.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of Separate Sections Of Energy-Saving Road Lighting Lines In The Tarnowiec Commune - 2025.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
07-11-2025 Closed
Work Detail
The Subject Of The Task Is Construction Of Separate Sections Of An Energy-Saving Road Lighting Line In The Tarnowiec Commune - 2025. The Description Of The Subject Of The Order Includes The Following Sections: • Construction Of A Road Lighting Cable Line In The Town Of Wrocanka, Municipal Road No. 113752R, Plot No. 216 - Stage I (Track 1) • Construction Of A Road Lighting Cable Line In The Town Of Glinik Polski, Road Na Magiel, Plot With Registration Number 1296 - Stage Ii (Track 2)• Construction Of A Road Lighting Cable Line In The Town Of Nowy Glinik, District Road No. 1885R, Plot With Registration Number 50/9 - Stage Ii (Track 1)• Construction Of A Road Lighting Cable Line In The Town Of Gąsówka - Internal Road Walowice A Detailed Description Of The Subject Of The Order And Technical Requirements Are Specified In The Technical Documentation, Bills Of Quantities And Stwior For Each Under Construction Scope Of Lighting. The Scope Of Work To Be Performed Includes: A) Earthworks - Excavations, Backfilling B) Laying Of Earth Cables And Protective Pipes With Cable Pulling, C) Drilling, Pushing D) Installation Of Street Lighting Poles In Accordance With The Developed Designs E) Installation Of Led Lighting Fixtures - Led Fixtures Should Be Use With The Powers Indicated In The Designs - Color Temperature Of The Light Minutes: 4000K - Neutral Color - Ip66 Protection Level For The Optical Part And Power Supply System - Replaceable Led Modules And Power Supplies - Min. Service Life Of The Luminaire (L90): 100,000 H,F) Installation Of Earthing Electrodesg) Construction Of A Lighting Control Cabinet H) Measurements I) Connection Of Lighting Cablesj) Commissioning Of Lightingk) Acceptance Of Network Operators Along The Route Of The Constructed Line - Enn, Gas, T-T, District Roads, Pgel) Preparation Of An As-Built Geodetic Inventory Along With Documentation For Each Part Order. The Scope Of Work Also Includes Other Work Necessary To Perform The Order, Not Included In The Documentation, But Necessary Due To Construction Practice, Technical Knowledge And Legal Regulations. The Bill Of Quantities Is An Auxiliary Document For Preparing A Price Offer. The Contractor Should Obtain Acceptance And Acceptance Of The Works From Pge Dystrybucja Sa Of The Network Constructed According To. Previously Defined Conditions.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5219b107-fa8b-42a8-a00a-22cec6af6160.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders