Railway Equipment – Retrofit Tunnel Peinture - Tergnier. The Technicentre Picardie - Tergnier Wishes To Retrofit Its Painting Tunnel (Dating From 1981) For The Sd3 The Future Painting Installation Must Allow: - Painting Of Rolling Stock Bodies (Agc And Corail) Including Preparation For Painting (Camouflage, Tracing, Etc.) / Degreasing / Painting / Desolvation - Removal And Application Of Lamination - Visual Inspection The Painting Tunnel Is An Integral Part Of An Existing Building And Will Require The Carrying Out Of Installation Work On The Installations, Lighting, Floor Filtration, Nacelles, Joinery, Plumbing, Electrical Cabinet, Pneumatic Distribution, Etc. Dismantling And Evacuation, As Well As Waste Treatment Will Be The Responsibility Of The Supplier.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.