Scratching And Shedding Of Old Emulsion On Ceiling And Interior Wall, Removal Of Plasterboard On The Ceiling (Frame Mixed Removal), Plastering On The Ceiling (Including Plasterboard, Profile, Scorpion, Etc.), Smoothing The Wall With A Spatula, Emulsion Painting On The Inner Wall (2 Times Painting According To The Sample), Restoration Of The Damaged Part Of The Suspended Ceiling 60X60 Only The Replacement Of The Panel (Damaged By Sewage Water), Old Emulsion Peeling Off The Wall In The Stairwell, Smoothing The Wall In The Stairwell With A Spatula, Painting The Wall In The Staircase Cage (2 Times Painting According To The Sample), Placing A Chest Board On The Walls (H=0.2 N=0.025 For The Chair According To The Drawing), Renovation Of Led Lamps On The Ceiling (0.2*0.2) Led Lighting, Construction Of Metal Plastic 2-Layer Door Block (Additional 2 Door Elbows), Restoration Of Parts Of The Roof That Have Been Destroyed And Dismantled Due To Rain And Wind (Metal Tile), Taxta 10 X 0.25, Wood 5X15
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.