. The Subject Of The Order Are Construction Works In A Four-Story Hotel Building, Consisting Of The Reconstruction Of 30 Rooms And 2 Utility Rooms. The Modernization Concerns 30 Of The Most Worn-Out Hotel Rooms And 2 Utility Rooms (Located On The Ground Floor) In A Four-Story Hotel Building In Kalsk. The Main Construction Works To Be Carried Out Will Include, In Particular: Replacement Of The Existing Aluminum Installation With A Copper Installation, Replacement Of Worn-Out Water, Sewage And Heating Installations, Reconstruction Of Bathrooms, Replacement Of Internal Joinery, Replacement Of Floors, Painting Of The Modernized Rooms, Etc. The Modernization Will Also Include The Modernization Of 2 Rooms Intended For A Disabled Person Staying With Guardian, Located On The Ground Floor Of The Hotel. 2. A Detailed Description Of The Subject Of The Order, A Description Of The Ordering Partys Requirements In Terms Of Implementation And Acceptance Are Set Out In: Appendix No. 1 - Construction Design Including: Appendix No. 1A - Technical Design Appendix No. 1B - Detailed Design Appendix No. 1C - Construction Design With Bioz Appendix No. 2 - Drawings And Diagrams Appendix No. 3 - Technical Specification For The Execution And Acceptance Of Construction Works (Stwiorb) Appendix No. 4 - Bill Of Quantities (Auxiliary) Annex No. 5 - Description Of The Subject Of The Order Annex No. 6 - Draft Contract The Bill Of Quantities Constituting An Annex To The Swz Should Be Treated As An Additional Element, Only Facilitating The Preparation Of The Offer. Bills Of Quantities Cannot Constitute The Only Basis For The Valuation Of The Subject Of The Contract. Bills Of Quantities Are Of An Auxiliary Nature, Facilitating The Preparation Of An Offer. The Contractor Is Obliged To Carefully Check The Number Of Works Against The Design Documentation. The Possible Absence Of Any Part Of The Order In The Bill Of Quantities Or In The Tables And Material Diagrams Contained In The Design Documentation, In Particular In The Detailed Design, Does Not Release The Contractor From The Obligation To Perform Them On The Basis Of Technical Documentation Or Opz At A Contractual Lump Sum Price.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.