Ventilation And Air-Conditioning Installation Work – Mpi For Intelligent Systems, New Building Cyber Valley: Rlt.1. New Installations: 2 Pieces Of Su And Ab Partial Air Conditioning Units, Each 21,500 M³/H With Wrg-Kv System, 2 Pieces Of Pps Fans, Each 1,000 M³/H, 2 Pieces Of Pps Fans, Each 4,000 M³/H, 33 Pieces Of Circulating Air Cooling Units 1.3 To 3.0 Kw, 62 Pieces Of Vvr Galv., 9 Pcs. Vvr Pps, 96 Pcs. Kvr Galv./Pur, 1 Pc. Jk Galvanized, 9 Pcs. Pps Butterfly Valves Round, 150 Pcs. Bsk+Lon Modules, 20 Pcs. Smoke Detector Triggers For Bsk, 97 Pcs. Ceiling Swirl Outlets, 44 Pcs. Stepped Swirl Outlets, 23 Pcs. Half-Round Source Air Outlets, 16 Pcs. 99 Pieces Pipe Grilles, 11 Pieces Poppet Valves, 2 Pieces. Pps Exhaust Air Towers, 1 Psch. Weather Protection Grille, 8 Pcs. Sd Galvanized Backdrops, 3 Galvanized Sd Splitters, 98 Galvanized Sd Pipes, 3 Galvanized Rsd-Pps, Approx. 1,220 M Galvanized. Pipes/Formings Nw 80-355, Approx. 221 M Pps Pipes/Form. Nw 50-500, Approx. 2,580 M2 Galv. Ducts/Forming, Approx. 210 M2 Pps - Ducts/Forming, Approx. 2,200 M2 Mw Insulation, Approx. 600 M2 Mw/Bm Insulation, 314 M² Diffusion-Tight Insulation Made Of Synthetic Rubber. Special Note Regarding Bidding Questions Due To Special External Events (E.G. Sars-Cov-2 Or Ukraine War): When Preparing Your Offer, Please Take Into Account Any Possible Or Recognizable Impairments, E.G. With Regard To The Availability Of Materials And Products, Workers, A Possible Delay In Providing The Required Evidence, Effects On Any Subcontractors, Etc. We Ask That You Ask Questions That Arise In This Context In Good Time Before The Offer Deadline Via The E-Procurement Messaging System.