Metalworking – Metal Construction Work 2, Tubular Frame Doors And Vestibule. As Part Of The New Construction Of A Vocational School Center In Pfarrkirchen, A Four-Story School Building Made Of Reinforced Concrete As A Column-Slab Construction And Four Workshop Buildings In A Monolithic Construction Made Of Reinforced Concrete Are Required. Some Of The Workshop Buildings Are Single-Story And Some Are Three-Story. The Buildings Are Built On A Hillside. The Construction Pit Has Already Been Dug And Shoring Work Has Been Carried Out. Supports Are Provided In In-Situ Concrete, Walls In In-Situ Concrete, And In The Facade Area, Parapets Made Of Semi-Finished Parts Are Provided Between Supports Over Individual Concreting Sections. In Some Areas Of The School Building, Prefabricated Reinforced Concrete Facade Elements And Sheet Metal Elements Are Installed As Cladding. The Floor Slabs Of The School Area And The Workshop Buildings Are Currently Completed. The Shell Of A Logistics Building, Also Planned For The Building Site And Partly Taking Place At The Same Time, Has Already Been Completed. Type And Scope Of The Service Of This Award (Essentially): A) Tubular Frame Doors: 2-Leaf Tubular Frame Doors W 2.10 To 2.65 M H 2.52 To 2.85 M - Approx. 63 Pieces 2-Leaf Tubular Frame Doors With Fixed Side Panel W 2.50 H 2.85 M - Approx. 44 Pieces B) Post-Transom Facade (Vestibule): Post And Beam Facade Interior U-Shaped (Wxhxd) = 7.75 X 5.26 X 2.58 M - 1 Piece 2-Leaf Tubular Frame Door W 2.44 H 2.645 M - 2 Pieces
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.