Excavation Of Soil With Excavators With A Capacity Of 0.5 (0.5-0.63) M3 Of Chalovun By Loading It Onto Dump Trucks, Soil Group: 2, Dump Truck, 17 T Transport Distance - 5 Km. 1St Class Cargo, Adjustment Of The Height Of The Well Covers, Height Lifting Size: Up To 10 Cm, Precast Reinforced Concrete Covers, Construction Of Foundations With A Thickness Of 15 Cm From 40-70 Mm Fractional Crushed Stone (When Rolling Stone Materials With A Compressive Strength Limit Of More Than 98.1 Mpa (1000 Kgq/Cm2)): One Layer, Add Or Subtract From Norms 27-04-005-1 To 27-04-005-3 For Every 1 Cm Of Layer Thickness Change (An Additional 5 Cm), Construction Of Paving And Leveling Layers Of Foundations: Sand-Gravel Mixture, Coarse Sand, A Mixture Of Sand And Gravel, Spillage Of Adhesive Materials, Construction Of A Cover With A Thickness Of 4 Cm From A Hot Asphalt-Concrete Mixture Of The Abv Type, Density Of Stone Materials: 2.5-2.9 T/M3, If The Thickness Of The Coating Changes By 0.5 Cm, Add Or Subtract From The Norm 27-06-020-1 (Additional 2 Cm)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.