The Subject Of The Order Are Construction Works On The Investment Task Entitled: Adaptation Of Rooms In A Municipal Building For The Purposes Of Establishing A Social Services Center. The Scope Of Works To Be Performed Includes In Particular: Demolition Works, Including: - Dismantling Of Internal Door Joinery (Doors With Door Frames), - Dismantling Of Bathroom Fittings (Washbasins, Toilet Bowls, Taps, Faucets). Washbasins), - Removing Loose And Damaged Plaster From Walls And Ceilings), - Dismantling Wall Coverings And Floors Made Of Tiles And Panels, - Dismantling Internal Window Sills, - Dismantling Partition Walls, - Dismantling The Central Heating Installation. (Radiators, Steel Pipes, Exhaust Fans, Etc.), - Dismantling The Electrical Installation, - Cutting Wall Grooves For Water And Sewage Installations, Central Heating. And Electricity. Renovation Works, Including: - Building Partition Walls To The Full Height Of The Room, - Inserting Lintels, Installing Door Frames And Doors (Bathroom Doors With A Bottom Undercut, Aluminum Entrance Doors At The Main Entrance), - Making Layers Leveling The Floor Surface, - Making Terracotta In Bathrooms With Anti-Slip Stoneware Tiles, - Making Tiles On The Walls In Bathrooms To A Height Of Min. 2.0 M, - Execution Of Lime Plasters And Their Addition, And Plastering Of Walls And Ceilings, - Installation Of Window Sills (Conglomerate), - Reconstruction Of Water And Sewage Lines. And Central Heating Plasterboards Along With Making Inspection Holes, - Installation Of Fittings (Washbasins, Toilet Bowls, Urinal, Washbasin Faucets, Valves With Hose Connectors, Floor Drains), - Installation Of New Radiators And Connection To The Existing Central Heating Installation. Including The Replacement Of Some Pipes Within The Rooms), - Double Painting Of Ceilings And Walls With Latex Paints, With One Priming (In Places Where There Is No Tile), - Installation Of Toilet Equipment (Soap Dispensers, Mirrors, Paper Towel Dispensers And Toilet Paper Holders), - Reconstruction And Connection Of The Water And Sewage Installation. For New Fittings, - Execution Of Electrical Installation (Replacement Of The Complete Cable Installation And Its Installation Under The Plaster, Installation Of Switches, Plug Sockets, Lighting Lamps Along With Measurement Of Light Intensity), - Construction Of Hardening With Paving Stones, - Construction Of A Ramp With A Steel Structure For Disabled People.