Corrigendum - Tenders Are Invited For Renovation Of Gas Turbine Firefighting Co2 System Enclosure At E Phase I-Jabel Ali

Tender Detail

103444657
2332502580
Self-Funded
Corrigendum - Tenders Are Invited For Renovation Of Gas Turbine Firefighting Co2 System Enclosure At E Phase I-Jabel Ali
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
21-10-2025

Work Detail

Quotation Are Invited For Renovation Of Gas Turbine Firefighting Co2 System Enclosure At E Phase I-Jabel Ali. Technical Specification And Scope Of Work For Renovation Of Gas Turbinefirefighting Co2 System Enclosure At E Phase I -Jabel Ali.The Exiting Enclosure#S Size Is (7.00Mtr L X 2.3Mtr W X 2.7Mtr H) Pergt.1.#Scope Of Work:A)#Dismantling Existing Damaged Enclosure & It S Members/Componentwithout Disturbing Internal Part Of Co2 System And Disposing To Approveddm Yard In Dewa.B)#Modification Of Existi Ng Foundation As Per Required Size And Asnecessary.C)#Fabricate, Sand Blasting, Painting, Supply And Installationincluding With Requ Ired Structural Member With Suitable Sealed Openingfor Co2 Discharge Piping.D)#Structure To Be Fabricated With Hot Dip Galvanized St Eel.E)#The Enclosures Walls And Roof Must Be Constructed From Steelfire-Resistant Insulated Sandwich Panels With (High-Quality, And Durablestructural Elements With Corrosion Protection Coating), Corrugatedsheets, Ensuring All Openings And Joints Are Tightly Seale D Withcladding.F)#Supply And Installation Of Drain Gutter, Downspout Pipe Etc., Asnecessary For Enclosure.G)#Single Shutter Fire Rat Ed Steel Doors Are Provided With A Lockingfacility Like Existing Doors And Existing Size Or As Per Industrystandard.H)#Additional Su Pport For Exhaust Fan, Ac, Lighting, Cabling, Pipingetc., Which Ever Necessary To Complete The Job.I)#Ga Drawings & Dimensional Sket Ch And Bill Of Materials (Includingthickness Of Materials, Type Of Coating, Painting) Shall Be Submittedwith A Bid To Evaluate The B Ids.J)#While Designing The Enclosure Dubai Climatic Condition Shall Beconsidered.K)#Final Dimensional Ga Drawings & Dimensional Sket Ch And Bill Ofmaterials Shall Be Submitted To Dewa For Approval Prior To Fabrications& Installation.L)#Contractors Shall Have A Site Visit And Take Actual Dimensionsbefore Submitting The Bid.M)#Contractors Should Take The Necessary Work Permits (Cold & Hot) Fromde Wa Concern Department Prior To The Start Of The Dismantling Of Theexisting Steel Enclosure.N)#The Contractor Must Restore The Enclos Ure#S All Necessary Support Tofacilitate Emd & I&C Installation By Dewa Staff2.#General Requirements:A)#Enclosure Should Have A Suit Ably Inclined Roof To Ensure Properdrainage Of Rainwater To The Nearest Drain.B)#The Pipework Must Be Adequately Supported. In The Event Of A Fire,The Discharge Will Exert Force On The Pipework. Any Failure Of Thispiping Could Cause Significant Damage To The Extin Guishing System.C)#Appropriate Allowances Must Be Made For The Expansion Andcontraction Of The Pipework.D)#The Enclosure And All Str Uctures Should Be Painted As Per Exitingfire Rated Paint & Ral Number.3.#Documents To Be Submitted With Bid:A)#Ga Drawings & Dimensi Onal Sketch And Bill Of Materials (Includinggrade, Thickness Of Materials, Make, Type Of Coating Etc.) Shall Besubmitted With A Bid To Evaluate The Bids, Otherwise Bids Will Not Beconsidered.B)#Schedule For Material Delivery And Execution.C)#Work Shall Be Planned According To Dewa Outage Schedule (10 Days Perunit)4.#Documents Required Before Starting The Work:Before Starting Work, The Successf Ul Bidder Must Submit The Followingdocuments For Each Gas Turbine To Dewa For Approval:A)#Ga & Dimensional Drawing With All Details Including Support.B)#Bill Of Materials With Details Of Grades And Thickness Etc.,C)#The Bidder Must Plan & Complete The Work To Conc Ern Gt#S Enclosureas Per Dewa Outage Plan.D)#Method Of Statement.E)#Risk Assessment.5.#Important Note:A.#The Contractor Shall Review , Have A Site Visit To Take Actualdimensions & Modify It Suitably To Meet Reliable/Safe Operation Andefficient Performance.B.#One Ye Ar#S Warranty From Date Of Completion For Materials &Workmanship And Two Years For Painting Shall Be Provided By Bidders. Thecontrac Tor Shall Attend Any Failure/Leak During This Period Withoutadditional Cost To Dewa.C.#Payment Upon 100% Completion Of Work And With In 45 Days Of The Dateof Invoice Certification As Dewa Standard Terms. Qty: 1 Renovation Of Gas Turbine Firefighting Co2 System Enclosure At E Phase I -Jabel Ali As Per The Scope <(>&<)> Specifications In Service Text. Dewa Contact: Mr. Rajesh Jain, Mobile: +971508816548, E Mail: Rajesh.Jain@Dewa.Gov.Ae. Mr. Mahesh Patel,Phone : 04-32 24930 E Mail: Maheshkumar.Patel@Dewa.Gov.Ae Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332502580)/$Value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document ace87dd2-df00-4612-9416-2a7b12beeabd.pdf
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail