Canal Construction - Canal Construction Works Rigole. Kum Ink Ziems1, 22019 San. Ziemssenbau The Work Includes I. W. The Construction Work For Sewer Construction Work For The Rw And Sw As Well As The Production Of A Packed Trench With An Upstream Pre-Treatment System West Of The Ziemsen Building. The Rainwater Is Fed Into The West Fill Trench Via Pipes Dn 300 And Dn 400 (The Emergency Drainage Is Carried Out Separately From The Regular Drainage). The Sewer Construction Work Is Carried Out Using Both Open Construction And Pipe Jacking Methods. Since Copper Roof Surfaces Are Also Connected To The Trenches, A Corresponding System Is Required. Pretreatment In The Form Of An Ion Separator Is Necessary. Approx. 165 M2 Dismantling And Restoration Of Road Construction Approx. 90 M2 Demolition Of Existing Sewer Dn 300 Pcs Approx. 90 M2 Installation Of Mixed Sewer Dn 400 Pcs 2 Pcs. Demolition Of Control And Manholes Dn 1200 10 Pcs. Installation Of Control And Manholes Dn 1200 29 M Pipe Jacking Dn 300 And 31 M Pipe Jacking Dn 400 1 Installation Of Filler Trenches And 1 Installation Ion Separator Dn 3000
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.