The Subject Of The Order Is The Ongoing Maintenance And Maintenance Of The Water Supply And Sewage Network In The Grudziądz Commune 2025/2026.2) Tasks In The Field Of Maintenance And Maintenance Of Collective Water Supply Devices: A) Maintaining Water Supply Devices In Good Technical Condition, And In Particular: Current Maintenance Of Devices And Pipelines, I.E. Replacement/Repair Of Faulty Or Damaged Fittings And Equipment, Cleaning Of Devices And Pipelines, Venting Of Networks And Systematic Cleaning Of Network Sections, Necessary For The Proper Functioning Of Measuring Devices. Removing Failures, Switching On, Performing Operation, Renovation, Repairs, Inspections, Maintenance Of Devices, As Well As Water Supply And Sewage Connections: - Owned By The Grudziądz Commune, - Located Behind The Water Measurement (Sales) Points, Sewage Supplying Water And Ensuring The Collection Of Sewage From Contractors Of The Grudziądz Commune. B) Immediate Removal Of All Leaks And Leaks In Water Supply Networks And Connections, C) Immediate Physical Removal Of The Failure No Later Than Within 4 Hours From Reporting And Removal Of The Failure No Later Than Within 24 Hours From Reporting. Appropriate Valves Protecting Against Loss Of Water From The Network Must Be Closed Within 4 Hours Of The Notification. By Failure, The Ordering Party Understands Damage To Pipelines Or Water Supply Devices That Causes Or May Cause Water Loss, Interruption Of Water Supply And Other Threats. The Contractor Takes Steps To Remove The Causes And Effects Of The Failure. In The Event Of A Failure Occurring In A Period Longer Than 12 Hours, The Contractor Will Launch A Replacement, Collective Water Intake Point, D) Activating A Replacement Water Intake Point At The Request Of The Ordering Party, E) Maintaining Documentation Of The Facilities And Networks In Use, F) Carrying Out The So-Called Connections To The Water Supply Network For Newly Built Connections: - Control Of Temporary Works, - Consultations With The Ordering Party Regarding The Designed Materials, - Closing Appropriate Valves For The Time Of Connection, - Installation Of Water Meters Provided By The Ordering Party, - Control Of The Execution And Acceptance Of The Constructed Connections, - Control Of The Materials Used By Investors By Comparing Them With The Conditions Issued By The Commune Grudziądz, - Preparing A Protocol For The Acceptance Of Connections, - Carrying Out Acceptance, - Integrating Water Supply And Sanitary Sewage Connections Into Existing Water Supply And Sewage Networks. G) The Contractors Obligations Include Connection To The Existing Water Supply And Sewage Networks For Newly Constructed Connections, In Accordance With The Templates Of Connection Protocols Attached To The Draft Contract, H) In Connection With Art. 19A Section 10 Of The Act Of June 7, 2001 On Collective Water Supply And Collective Sewage Disposal (Journal Of Laws Of 2024, Item 757), The Contractor Is Obliged To Include In The Offer Pri
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.