Common Procurement Vocabulary (Cpv): 37535200-9 Playground Equipmenta. The Subject Of The Order Is The Retrofitting And Modernization Of Recreational Facilities - Retrofitting The Playground At Ul. 1 Maja (Jordanek);B. The Scope Of The Order Includes, Among Others: The Following Works: 1) Delivery And Installation Of A Large Play Set For Children; 2) Construction Of A Sandy Safety Zone. C. The Execution Of The Order Also Includes: 1) Informing The Ordering Party About The Current Status Of The Task Implementation. In Particular, Before Each Stage Of Completion Of Fading Works. The Ordering Party Will Control The Manner Of Their Implementation To Verify Whether All Standards Have Been Met. If These Conditions Are Not Met And Doubts Arise, The Contractor Will Be Obliged To Dismantle The Place Of Disappearing Works And Redo It In Accordance With The Employers Assumptions. The Contractor Will Perform All These Re-Performance Activities At His Own Expense; 2) Tidy Up And Level The Area After Completing All The Work, And Dispose Of Any Excavated Rubble Or Other Waste At Its Own Expense In Accordance With Applicable Regulations. Throughout The Entire Area Covered By The Scope Of Work, In Places Where Soil And Grass Losses Occurred, The Contractor Will Repair These Places And Sow Grass, For Which He Will Provide A One-Year Warranty Counted From The Date Of Final Acceptance Of The Entire Task; 3) Renovations And Repairs Of Any Damage Caused During The Work, E.G. Damage To Sidewalk Surfaces; 4) Transport Of Equipment From The Base To The Work Site And Back At The Companys Own Expense; 5) Providing And Handing Over To The Ordering Party, Before The Final Acceptance, Certificates Confirming The Construction Of The Playground Equipment In Accordance With The Applicable Standard Pn - En 1176 - 1:2017 Or Equivalent. For Verification Purposes, The Contractor Will Be Obliged To Present Pca Certificates (Polish Center For Accreditation) Issued By An Accredited Certification Body For The Supplied Play Set. The Original Certificates Must Be Submitted To The Ordering Party No Later Than The Date Of Receipt Of The Works. D. Requirement For Employment Under An Employment Contract. Pursuant To Art. 95 Of The Public Procurement Law. The Ordering Party Requires That The Contractor Or Subcontractor, Under An Employment Contract, Employs Persons (Workers) To Perform The Following Activities Necessary To Complete The Order: Assembly Works Of Playground Equipment. The Method Of Employment Verification, The Ordering Partys Control Rights And Sanctions For Failure To Meet The Requirements Are Specified In The Draft Provisions Of The Agreement. E. A Detailed Description Of The Subject Of The Order Is Specified In Particular By: Description Of The Subject Of The Order, Draft Provisions Of The Contract, Posted Together With Annexes In An Electronic Version On The Website Of The Conducted Procedure, Constituting An Integral Part Of The Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.