Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
17-10-2025
Work Detail
Quotation Are Invited For Limestone Transfer Pump Installation For B10 & B20-G Desal-P11032504231 1 Item-00001 For More Info:Manu.Vkurian@Dewa.Gov.Ae05210149481. General Overviewthe Contractor Shall Be Responsible For The Removal Of The Existi Ng Pumpand Installation Of The New Pump Supplied By Dewa. The Work Shall Beexecuted In Accordance With The Highest Standards Of Safe Ty, Quality,And Workmanship, Ensuring Minimal Disruption To Ongoing Operations.2. Scope Details2.1 Removal Of Existing Pump·#Careful Ly Disconnect And Dismantle The Existing Pump And Associatedequipment.·#Safely Remove The Pump From Its Current Installation Locatio N Withoutcausing Damage To Adjacent Equipment Or Infrastructure.2.2 Installation Of New Pump·#Receive And Inspect The New Pump Suppl Ied By Dewa Upon Delivery Toverify Completeness And No Visible Damage.·#Position And Install The New Pump 1 Ea In The Designated Location ,Ensuring Proper Alignment And Mounting.·#Connect The Pump To Existing Piping And Other Interfaces As Required.2.3 Pump Base And Civ Il Work·#The Contractor Shall Be Responsible For The Fabrication Of Baseframes If Required To Support The New Pump.·#All Civil Works Related To The Pump Base Are Under The Contractorsscope, Including But Not Limited To Foundation Preparation, Grouting,And Levelli Ng To Ensure Stable And Vibration-Free Pump Installation.2.4 Tools, Equipment, And Consumables·#The Contractor Shall Provide All Nec Essary Tools, Consumables, Nutbolts, Welding Equipment, And Skilled Personnel (Welders, Fabricators)Required To Complete The Removal And Installation. Special Notes / Instructions: Limestone Transfer Pump Installation For B10 <(>&<)> B20-G Desal-P1. For More Information And Details Please Contact: Manu.Vkurianmanu.Vkurian@Dewa.Gov.Ae Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332502573)/$Value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.