Tenders Are Invited For Modernization Of Sanitary Facilities In Primary School No. 1 In Kłodzko Implemented As Part Of Removing The Effects Of The Flood Of September 2024.
Tenders Are Invited For Modernization Of Sanitary Facilities In Primary School No. 1 In Kłodzko Implemented As Part Of Removing The Effects Of The Flood Of September 2024.
The Order In Question Is Being Implemented As Part Of The Removal Of The Effects Of The Flood Of September 2024. The Subject Of The Order Describes In Detail The Detailed Design, Technical Specifications For The Execution And Acceptance Of The Works. The Subject Of The Investment Is The Modernization Of Sanitary Rooms In The Central Part Of The School On 4 Floors Of The Building. In The Sanitary Part Being Developed, Some Of The Existing Walls Should Be Demolished And New Rooms Should Be Separated In Accordance With The Design. In New Toilet Rooms, New (System) Toilet Cabins Should Be Installed, Sanitary Fittings Should Be Replaced Or New Ones Should Be Inserted (According To The Design), And New Wall Cladding Should Be Made In The Form Of Ceramic Tiles. Vertical Shafts Should Also Be Enclosed. It Is Planned To Provide A Toilet Adapted For Disabled People, Also Available To Teachers. The Floor In Sanitary Rooms Should Be Made Of Anti-Slip Ceramic Tiles. Walls And Ceilings Are Also Planned To Be Painted In Sanitary Rooms. Before Entering The Toilets, An Entrance Area Is Planned That Will Be An Extension Of The Existing Corridor. The Walls And Ceiling Are Planned To Be Painted And Pvc Flooring Installed In This Room. It Is Planned To Install Suspended Ceilings In The Rooms, Reducing The Height Of The Rooms On Each Floor To 2.5 M. Scope Of Works In The Field Of Water Supply And Sewage Installation: • Dismantling The Water And Sewage Installation In Toilet Rooms, • Dismantling Sanitary Utensils, • Installation Of Sanitary Utensils, • Installation Of Cold And Hot Water Pipelines In The Newly Designed Bathroom, • Installation Of Fittings, • Installation Of Sanitary Sewage Pipelines, • Installation Tests, • Thermal Insulation, • Regulation Of Installation Operation. Scope Of Construction Works: • Demolition Works Including Removal Of Rubble • Construction Of Partition Walls: Plasterboards, Steel Profiles, Installation Of Sanitary Partition Walls Made Of Laminate, • Construction Joinery Works, • Plastering, • Construction Of Floor Surfaces (Pvc), • Laying Tiles: Ceramic Floor, Walls – Tiles Ceramic, • Installing Suspended Ceilings, • Painting And Finishing Works. The Contractor Whose Offer Is Selected As The Most Advantageous Will Be Obliged To Submit Full Bid Cost Estimates (If He Does Not Attach Them To The Offer) And A Material And Financial Schedule; Up To 7 Days From The Date Of Signing The Contract With The Ordering Party.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.