3.1. Material Scope Of The Subject Of The Order: The Subject Of The Order Is The Performance Of Construction Works Consisting In The Renovation Of The Roof, Facade, Replacement Of Door Joinery, Adjustment And Reconstruction Of Internal Installations, Adaptation Of Rooms (Changing The Functions Of The Kitchen And Office, Dividing The Bathroom Into Two Rooms), Construction Of A New Septic Tank (Septic Tank) And Fencing Of A Single-Family Residential Building - Foresters Lodge Of The Strzeszewo Forestry, In Accordance With The Design Documentation And Bill Of Quantities. Note: This Procedure Does Not Take Into Account The Construction Of A Drilled Well Or Related Works. The Effect Of The Order Is To Be A Comprehensive Renovation, Reconstruction And Adaptation Of The Leśniczówka Building To The Current Utility Needs, Including: • Tight And Aesthetic Roof Covering, • Renovated Façade, • Adapted Water And Sewage, Electrical And Ventilation, • Changing The Functions Of The Rooms (Kitchen ↔ Office), • Dividing The Bathroom Into Two Independent Rooms With New Doors And Equipment, • Constructing A Complete Fence And A Tight Septic Tank, • Handing Over A Fully Functional, Aesthetic And Ready-To-Use Facility. Basis For The Execution Of The Order: • Architectural And Construction Design Prepared By M.Eng. Zbigniew Kotłowski, August 2025,• Bill Of Quantities Renovation Of The Roof And Facade Of A Single-Family Residential Building - Leśniczówka Roszczyce,• On-Site Visit Of The Facility And Arrangements With The Investor,• Applicable Provisions Of The Construction Law, Polish Standards And Technical Guidelines.3.2. The Scope Of Work Includes The Performance Of All Works Described In The Design Documentation And Bill Of Quantities (Auxiliary), Excluding The Construction Of A Drilled Well, In Particular: 1) Preparatory And Dismantling Works• Dismantling The Existing Roofing Made Of Metal Tiles - Approx. 140 M², • Dismantling Battens, Counter-Battens, Gutters, Downpipes And Sheet Metal Flashings - Approx. 40 M, • Cleaning And Impregnation Roof Truss Elements - Approx. 1.2 M³ Of Wood, • Disassembly Of Doors, Fittings, Sanitary Facilities And Equipment Elements To Be Replaced.2) Roof Renovation • Installation Of A New Roof Covering Made Of Tile-Like Sheet Metal - Approx. 140 M², • Thermal Insulation Made Of Mineral Wool - Approx. 130 M², • Installation Of The Roof Membrane, Counter Battens, Patches And Flashings Sheet Metal Work - Approx. 25-30 M², • Installation Of A Gutter System - Approx. 40 M², 3) Renovation Of The Facade, • Cleaning And Repair Of Plasters - Approx. 200 M², • Installation Of New Thin-Layer Plaster And Painting Of The Facade - Approx. 200 M², • Renovation Or Replacement Of Wooden Cladding In The Attic - Approx. 25 M², • Installation Of New External Doors With Increased Insulation Thermal – 1 Pc.4) Internal Finishing Works• Leveling And Painting Of Walls And Ceilings – Approx. 300 M², • Replacement Of Floors (Stoneware Tiles) – Approx. 30 M², • Ti