Scope Of Works To Be Performed: I. Execution Of Works In The Construction Industry I.1. Demolition And Dismantling Worksi.2. Earthworks Including Pumping Water From The Excavation And Replacing Backfill Soili.3. Making Holes In Reinforced Concrete Walls With Lintels I.4. Strengthening The Reinforced Concrete Ceiling Slab By Bottom Spraying Using Reinforced Shotcrete Technology (Spraying Concrete Mass 4 Cm Thick)I.5. Construction Of Steel Columns Reinforcing The Ceiling Beams Above The Basement Floor I.6. Implementation Of Moisture-Proof Insulation Of Vertical Walls I.7. Thermal Insulation Of Vertical Walls I.8. Construction Of Partition Wallsi.9. Installation Of Internal And External Joinery And Joinery I.10. Construction Of Entrance Stairs On The Eastern And Southern Facades With Entrances Outside The Debris Zone Adapted To The New Functional Layout I.11. Execution Of Construction Finishing Works (Flooring, Plastering, Painting, Cladding Works)I.12. Renovation Of The Eastern And Southern Facadesii. Installation Of A Mechanical Ventilation System * Iii. Construction Of Water And Sewage Installations With White Installation Iv. Relocation Of Water Supply And Storm Sewage Systemsv. Execution Of The Central Heating Installation. Construction Of Electrical And Lighting Installations With White Assembly And Accessoriesvii. Construction Of Telecommunications Installation (Communications) Viii. Construction Of A Temporary Perimeter Drainage Of The Building Along With Drainage Of Rainwater And Groundwater Via A Stormwater Sewage Connection. Ix. Reconstruction Of Infrastructure And Surroundings Within The Scope Of Works And Use For Construction Organization Purposes, I.E. Greenery, Parking Lots, Roads, Sidewalks In A Condition No Worse Than On The Day The Construction Site Was Handed Over. The Obligation In Question Concerns The Area Of Plot No. 875/1 As Well As Neighboring Plots. *Adaptation (Design Correction) Of Ventilation To The Needs Of A Temporary Shelter (20 M³ / Person / Hour) Note: The Detailed Scope And Technical Description Of The Order Implementation Are Presented In The Attached Design Documentation And Technical Specifications For The Execution And Acceptance Of Works, As Well As Work Bills - Constituting An Integral Part Of The Swz (Appendix No. 11 - 13 To The Swz).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.