Tenders Are Invited For Commissioned Surveying, Design, Supervision And Monitoring Work For The Dredging Operation Downstream Of The Gaoping River Cable-Stayed Bridge (Section 62-65) In 2015 (Open Contract)
Tenders Are Invited For Commissioned Surveying, Design, Supervision And Monitoring Work For The Dredging Operation Downstream Of The Gaoping River Cable-Stayed Bridge (Section 62-65) In 2015 (Open Contract)
Commissioned surveying, design, supervision and monitoring work for the dredging operation downstream of the Gaoping River cable-stayed bridge (section 62-65) in 2015 (open contract)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.