Engineering Services – Sel 5 Road Dish. To Ensure A Future-Proof Expansion Of Its Existing Natural Gas Network, Terranets Bw Gmbh (Terranets Bw) Is Planning The Spessart-Odenwald Pipeline (Spo). The Planned Natural Gas Transport Pipeline With A Total Length Of Approximately 117 Kilometers Runs Through The Federal State Of Hesse And The Free State Of Bavaria. It Has A Nominal Width Of Dn 1,000 And A Pressure Rating Of Pn 90. Fiber Optic Cables For Data Transmission, Operational Remote Control And Other Communication Are To Be Laid In Parallel Cable Protection Tubes. The Standard Coverage Of The Pipes Is 1.2 M; In The Area Of Special Crops, Greater Depth May Be Necessary. Information Posts Should Be Installed Within Sight Or In Critical Areas. The Protective Strip Should Be 5 M On Both Sides Of The Pipe Axis (I.E. A Total Width Of 10 M). Newt Locks Are To Be Installed In Wirtheim And Lampertheim And A Gas Pressure Control Measuring System Is To Be Installed In Wirtheim. Additional Groups Of Fittings And Route Closure Stations Are Planned Along The Route. The Standard Work Strip Should Be 34 M Wide, While It Will Be Locally Restricted In Areas Of Bottlenecks Or In The Forest. The Route Is Largely Based On The Route Of The Existing Midal Central-Germany Connection Line. In The Federal State Of Hesse And The Free State Of Bavaria, The Spo Runs From North To South Through The Districts Of Main-Kinzig, Aschaffenburg, Offenbach, Darmstadt-Dieburg And Bergstrasse. The Overall Spo Project Was Divided Into Four Planning Approval Sections: - Section Hessen-Nord (Pla) O From Sp 0+000 To Approx. Sp 35+090, Or From The Location Of Wirtheim (Municipality Of Bieber-Gemünd) - Location Of Klein-Auheim (City Of Hanau) O Length Approx Approx. Sp 83+220, Or From The Locality Of Klein-Auheim (Town Of Ha-Nau) - Locality Of Herchenrode (Municipality Of Modautal) O Length Approx. 48.1 Km - Section Hesse-South (Plc) O From Sp 83+220 To Approx. Sp 116+700, Or From The Locality Of Herchenrode (Municipality Of Modautal) - Locality Of Lampertheim (City Of Lampertheim) O Length Of Approx Km - Section Bavaria (Pld) O Im Free State Of Bavaria, Various Route Sections Within The Hesse-Nord Section (Pla) O Length Approx. 1.5 Km The Project Developer Has Submitted A Notification In Accordance With Section 15 Paragraph 1 Sentence 2 Rog. In Particular, Due To The Almost Continuous Parallel Situation With Midal, The Authorities Have Already Determined That No Spatial Planning Procedure Is Required For The Spo. The Responsible Planning Approval Authority For The Three Planning Approval Procedures In The State Of Hesse Is The Darmstadt Regional Council. The Responsible Planning Approval Authority For The Planning Approval Process In The State Of Bavaria Is The Government Of Lower Franconia.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.