General Procurement Notice For Regional Electricity Market Interconnectivity And Trade Component 1: Improvement Of Transmission Line Infrastructure: Component 2: Extension And Modernization Of Dushanbe And Regar Substations Of 500 Kv Which Aims To Modernize Two Existing Vital Important Substations Of The Energy Sector In The Country To Ensure Reliability Of Energy Supply Consumption To The Dushanbe And The Whole Country. Component 2 Comprises Of Sub-Component 2.1 And 2.2 Which Will Be Packaged As One Single Contract. I. Sub Component 2.1: This Sub Component Will Support The Extension Of The Existing Dushanbe 500/220/35 Kv Substation. Sub Component 2.2: This Sub Component Will Support The Modernization Of The Existing Regar 500/220/35 Kv Substation. Component 3 Will Finance The Consulting Services As Follows: I. Sub-Component 3.1: Project Management And Supervision: Consultancy Services For Preparation Of The Technical Design, Bidding Documents, Support To The Bidding Process And Project Management And Supervision Of Construction Works For Transmission Line Between Dushanbe And Regar Substations And Modernization Of 500/200/35 Kv Dushanbe Substation And 500/220/35 Kv Regar Substation. Sub-Component 3.2: Consultancy Services The Detailed Engineering Design For The F: Construction Of A 500 Kv Transmission Line From The Rogun Hydroelectric Power Plant To The Sayhun Substation Of The Project;. 500/220/35 Kv Sayhun Substation; Outgoing 220 Kv Transmission Lines From 500/220/35 Kv Sayhun Substation; Construction Of A 500 Kv Transmission Line From The Sayhun Substation To The Sugd-500 Substation. Rehabilitation Of 220 Kv Kristall Substation, Construction Of 220 Kv Kristall-Yulduz Transmission Line From Kristall S/S To The Kyrgyz-Uzbek Border With Length Approximately 17.9 Km. (Lot 1 - Rehabilitation Of 220 Kv Kristall Substation;Lot 2 - Construction Of 220 Kv Kristall-Yulduz Transmission Line From Kristall S/S To The Kyrgyz-Uzbek Border With Length Approximately 17.9 Km.) Rehabilitation Of 220 Kv Torobaeva Substation Consultancy For Development Of Feasibility Study (Including Esf), Bidding Documents For The Construction Of 220 Kv Kristall-Yulduz Transmission Line, Rehabilitation Of 220 Kv Kristall And Torobaeva Substations And Further Supervision For Construction Works For Construction Of Kristall-Yulduz Transmission Line Rehabilitation Of Kristall Substation 1. Rfb/Remit/2025: The Project Comprises Of The Construction Of 220 Kv Transmission Lines And The Extension Of Existing Substations By 220 Kv Line Bays. The Project Is Divided In Two Lots: Lot 1: Construction Of 220 Kv Transmission Lines (Rfb/Remit/2025-01); Lot 2: Extension Works At Existing Substations (Rfb/Remit/2025-02). Tentative Timeline For Procurement Notice: 10Th - 20Th October 2025 2. Uz-Cs-01: Consultancy Services For Design Review And Supervision Including Environmental And Social Safeguards Monitoring
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.