The Scope Of Works Carried Out At This Stage In The Scope Of Reconstruction And Modernization Of The Sauna Area Will Concern: A Dry Sauna, An Ir Sauna, A Relaxation Room, An Entrance Area With A Cloakroom And A Changing Room, And Will Include The Following Works: - Demolition Works: 1) Demolition Of Casings Of Installation Risers, Columns And Beams Made Of Plasterboards With A Demolition Area Of Over 2 M2 - Double Cladding, 2) Dismantling Walls And Columns In Buildings Up To 9 M High (Up To 2 Floors) Using Cement And Lime Mortar, 3) Dismantling Floors Made Of Ceramic Tiles, 4) Dismantling Wall Cladding Made Of Ceramic Tiles, 5) Reflecting Internal Plasters Made Of Cement And Lime Mortar On Walls And Pillars, Pilasters With A Reflection Area Of Over 5 M2, 6) Dismantling Wooden Floors On The Substructure, 7) Dismantling Wooden Partition Walls, 8) Dismantling The Equipment Of The Existing Sauna, 9) Dismantling The Equipment Of The Existing Ir Sauna, 10) Dismantling The Door Joinery. - Transport And Disposal: 1) Transport Of Rubble In A Self-Dumping Vehicle With Manual Loading And Mechanical Unloading On Distance 10 Km, 2) Environmental Fee For The Disposal Of Construction Rubble (17/01/01), 3) Environmental Fee For The Disposal Of Wooden Waste (17/02/01), - Finishing Works: 1) Floors: A) Underfloor Layers, B) Floor Made Of Planed Spruce Boards 32 Mm Thick, C) Double Painting Of Wooden Floors With Lacquer Stain, 2) Walls: A) System Partitions Made Of Hpl Boards With Doors, B) Full Partition Walls Made Of Solid Bricks, 1/2 Brick Thick, C) Openings For Doors, Balcony Doors And Gates In Masonry Walls Up To 1 Brick Thick Made Of Single Bricks, Blocks And Hollow Bricks, D) Openings In Masonry Walls - Arrangement Of Prefabricated Lintels, E) Shaft Cladding With Wooden Cladding On The Substructure And Mineral Wool Insulation, F) Wall Cladding With Wooden Cladding On The Substructure And Mineral Wool Insulation, G) Partition Wall With Wooden Cladding On The Substructure And Mineral Wool Insulation, 3) Ceilings: A) Suspended Ceiling With Wooden Cladding On The Substructure With Mineral Wool Insulation, 4) Doors: A) Internal Doors To The Sauna, B) Internal Aluminum Doors, Equipped With Door Closers, 5) Equipment: A) Casing Of Platforms And Benches Made Of Spruce Boards In The Sauna, B) Backrest - Wooden Strip, C) Sauna Equipment (Including Controller, Sauna Heater, Lighting, Ventilation, Bucket),D) Ir Sauna Equipment (Including Infrared Heating Panels, Lighting, Ventilation),E) Tripod Turnstiles,F) Lockers,G) Cloakroom Bench, - Installation: 1) Modernization Of The Mechanical Ventilation Installation, 2) Modernization Of The Electrical Installation, - In The Remaining Scope: 1) Preparation Of As-Built Documentation, - Accompanying Works And Works Temporary: 1) Making Foil Protection, 2) Removing Waste Generated During The Task, 3) Washing And Vacuuming The Rooms After Completing The Works On A Given Day.4. A Detailed Description Of The Subject Of The Order I