Road Construction Works-Road, Plumbing And Public Lighting Work. The Section Affected By The Development Is Located In The Inner City Of Zalaegerszeg, In The Part Of Neszele, From The Accession Of The Gébárti Út (7406 J. Ök. 1+727 Km Section). The Purpose Of The Construction Is To Develop The Road Network Of Zalaegerszeg Settlement, And To Develop The Current Road Areas Without Solid Pavement, Which Develops The Standard Of Living And Quality Of Life Of The Residents Of The Settlement. Thanks To The Road Section In The Investment, Access Times Decrease And The Approach To Various Neighboring Properties Is Developing Greatly. The Terrain Is Slightly Hilly, And The Terrain Rises Slightly From The Beginning Of The Section To The End Of The Intervention Section. The Development - 330 Meters Long On Csillagvölgyi Street, Is Built On The West Side, With A 330 -Meter -Long, 6 Meter Wide Asphalt Pavement, Between K Edges. On The West Side Of The Casing, A 2 Meter Wide Pavement Pavement Is Built. - A 97 -Meter -Long Asphalt Pavement Road Is Built On Esthajnal Street, 6 Meters Wide, Between High -South And North Sides. On The South Side Of The Casing, A 2 Meter Wide Pavement Pavement Is Built. - The Jedlik U. 44 Meters Long 4 Meters Wide Asphalt Paved Road From Its No Longer With A Pavement. To Drain The Rainwater Under The Casing, The West Of Csillagvölgy Út, Esthajnal U. North And Jedlik U. A Closed Rainwater Canal Is Built On The West Side, Which Is Connected To The Road Ditch Near Gébárti Road. The Real Estate Affected By Road Construction (6354/1, 6357/1) Requires The Construction Of The New Land Border And The 6357/1 Hrs. Water Pipeline In The Framework Of The Investment, The V1 129 Meter Long Dn 110 Kpe Plumbing Will Be Built With V2b1 Access Line And The Esthajman - Csillagvölgy U. A Fire Tap At The Intersection Is Relocated. As Part Of The Investment, The D150 Kpe Sewage Connection Of 7.84 Meters Long Is Based On The 6353 Property. Public Lighting From The Column Of Esthajnal Utca M Between The Column Of The Csillagvölgy Street É8, 510 Meters Of Public Lighting Cable, 13 Candelabra And 16 Luminaires. The Lighting Fixtures Must Be Placed On The Zhaga Book 18 Connector, While The Lighting Fixtures Are A Communication Protocol. Main Quantities: - Making A Protective Layer From Sandy Gravel 1000 M3 - Create Cement Stabilization Mixed On The Site (Ckt -4) 814M3 - Asphalt Mixture Ac 11 118.78M3 (Cover Surface 2970 M2) - Asphalt Mixture Ac 11 137.85 M3 Building Of The Edges 541M - Bench Mechanical Stabilization 138 M3 - Precipitation Spine Construction 592 M - Precipitation Cross Channel Construction 156.7M - Upper Watering Shaft With Cast Iron Cover 29 Pcs - Rainfall Cleaning Shaft 24 Pcs - Construction Of Spin 2Blsb16 Ets 450Ma 45W 3000K Public Lighting Lumina For, Hdmr Os-Zhaga M2m Nb-Iot Kü
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.