GTR 103188450
Tenders Are Invited For Engineering Design Services For The Construction Of Civil Engineering Works – Preparation Of Design Documentation For Small Lowland Retention Facilities In The Rudy Raciborskie Forest District (Mrn3)
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
103188450
Tendering Authority
Subscribe to view
Tender No
671367-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Engineering Design Services For The Construction Of Civil Engineering Works – Preparation Of Design Documentation For Small Lowland Retention Facilities In The Rudy Raciborskie Forest District (Mrn3)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
12-11-2025
Closed
Work Detail
Engineering Design Services For The Construction Of Civil Engineering Works – Preparation Of Design Documentation For Small Lowland Retention Facilities In The Rudy Raciborskie Forest District (Mrn3). The Order Was Not Divided Into Parts - The Justification Is Included In The Swz. As Part Of The Design Documentation, The Contractor Is Obliged To Perform: A Construction And Executive Design (Used, Among Others, At The Stage Of Preparing The Tender Documentation For The Performance Of Construction Works To Describe The Subject Of The Order), Consisting, In Accordance With Applicable Regulations, Of: A) A Construction Design Taking Into Account The Specificity Of The Order, In Particular The Natural And Technical Conditions, B) An Executive Design Constituting Supplementing And Detailing The Construction Design (To The Extent And Degree Of Accuracy Necessary To Perform Construction Works) Constituting The Basis For Preparing The Bill Of Quantities For Construction Works, Containing Detailed Drawings And Profiles Along With A Detailed Description Of Construction And Technological Solutions, Geotechnical Research Together With An Opinion, Used To Assess The Geological And Morphological Conditions Of The Area And Being The Basis For Determining Geotechnical Conditions Foundation Of Building Structures, Hydrological Documentation Constituting The Basis For The Dimensioning Of Hydrotechnical Structures, Bill Of Quantities Of Works With The Calculation And Summary Of The Number Of Bill Of Quantities Units Of Basic Works For Each Of The Facilities. Investors Cost Estimate Prepared On The Basis Of The Prepared Bill Of Quantities With Prices Resulting From The Output Data Protocol For Cost Estimation Prepared At The Stage Of Implementation Of The Design Documentation, Stwiorb Containing Sets Of Requirements Necessary To Determine The Standard And Quality Of Work In Terms Of The Method Of Carrying Out Construction Works, The Properties Of Construction Products And The Assessment Of Their Correctness. Preparation Of The Above-Mentioned Documentation Also Includes Obtaining All Opinions, Arrangements, Permits And Administrative Decisions Resulting From Legal Provisions And Requirements For Tasks Co-Financed From Eu Funds: A) Decision On The Environmental Conditions For The Implementation Of The Project (Together With Opinions/Resolutions Of Ppis And Rdoś) Or A Decision Discontinuing The Proceedings B) Extract From The Local Spatial Development Plan C) Decision On The Conditions Of Development And Land Development/Decision On Determining The Location Of A Public Purpose Or Refusal To Issue A Decision, D) Decision On A Water Permit Based On A Report Prepared For Water Law Investigations With Annexes: Declaration Of The Authority Responsible For Monitoring Natura Areas 2000 Declaration Of The Authority Responsible For Water Management E) Decision Establishing The Conditions For Carrying Out Activities Pursuant To Art. 118 Of The Nature Protection Act, F) Notification Of Works To The Regional Directorate For Environmental Protection G) Decision On A Building Permit If The Competent Authority Issues A Decision On The Need To Conduct An Environmental Impact Assessment (Eia) And Prepare An Eia Report, The Obligation To Prepare It Rests With The Contractor. The Contractor Is Obliged To Prepare Maps For Design Purposes Taking Into Account The Scope And Specificity Of The Project Planned For Implementation, Prepared By A Surveyor With Appropriate Qualifications, To
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
33d14ce1-fee4-46c5-b52d-493afcfb1e03.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.