GTR 103183585
Quotation Are Invited For Deluge Valve Removal, Refurbishment, Installation And Commissioning Of L1 Station
ICB — International Competitive Bid
Closed
Asia
Tender Information
GTR Reference
103183585
Tendering Authority
Subscribe to view
Tender No
2412501633
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Deluge Valve Removal, Refurbishment, Installation And Commissioning Of L1 Station
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
15-10-2025
Closed
Work Detail
Quotation are invited for Deluge Valve Removal, Refurbishment, Installation and Commissioning of L1 Station. TITLE: DELUGE VALVE REMOVAL, REFURBISHEMENT, INSTALLATION ANDCOMMISSIONING.SIZE - 3",4" & 6" (QTY 5 EACH).PERIOD OF WORK: 5 DAYS AFT ER COLLECTION FROM DEWA (TENTATIVE DATE INBETWEEN 15.07.2025 TO 31.12.2026)SCOPE OF WORK1.#THE CONTRACTOR SHALL VISIT THE SITE AND M AKE HIMSELF FULLY FAMILIARWITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, SAFETYMEASURES, DELUGE VALVE LOCATIONS ETC., BEFORE HE SUBMITS HIS BID.2.#SUBMIT DETAILED SCHEDULE, RISK ASSESSMENT AND METHOD OF STATEMENT INADVANCE TO DEWA.3.#OBTAIN GATE PASS FOR STAFF AND VEHICLE TO COLLECT THE DELUGE VALVES(CONTRACTOR MUST SUBMIT THE NECESSARY GATE/ ENTRY PASS DOCUMENTS, TODEWA ENGINEER WELL IN ADVANCE).4.#THE CONTRACTOR SHALL CONSIDER ONE MOBILIZATION FOR EACH DELUGEVALVE; HOWEVER, DEWA WILL TRY TO ISSUE PERMIT TO WORK ON MULTIPLEDELUGES IN A SINGLE MOBILIZATION (SUBJECTED TO OPERATION AND I&CDEPARTMENT APPROVALS)5.#CHECK CONDITIONS ARE SUITABL E FOR CARRYING OUT WORK. CONDUCT SITESURVEY AND SAFETY INSPECTION TO ASSESS THE WORKING ENVIRONMENT.6.#A SAFETY MEETING WILL BE HELD TO EVALUATE THE RISK INVOLVED INMETHODS TO BE USED. RISK ASSESSMENT AND TOOLBOX TALK TO BE GIVEN TO THEEMPLOYEES.7.#PARTY SHOULD MO BILIZE THE LABOR, EQUIPMENT, TOOLS, ETC. IMMEDIATELYAFTER DEWA NOTIFICATION. THE PARTY SHALL BE READY TO START THE WORK WITHA ONE-DA Y ADVANCE NOTIFICATION.8.#ALL LIFTING AND POWER TOOLS SHALL BE TESTED AND THE TEST CERTIFICATETO BE PROVIDED TO DEWA.9.#PARTY SHALL VERIFY THAT SCAFFOLDS ARE SAFE TO WORK, AND VALIDSCAFFOLDING TAGS ARE PROVIDED BEFORE USING ANY SCAFFOLDING.10.#AFTER RECEIVING PTW AND I&C DISCONNECTION, REMOVE EXISTING DELUGEVALVE AND FITTINGS FROM THE LINE WITHOUT DISTURBING NEARBY EQUIPMENT.11.#REMOVE THE PIP ING, STRAINERS, EASY LOCK AND OTHER CONNECTIONS FROMTHE EXISTING DELUGE VALVE.12.#CLEAN EXISTING DELUGE VALVE STRAINERS AND INSTALL NEW DELUGE VALVEASSEMBLY IN LINE WITH ALL PIPING AND INSTRUMENT CONNECTIONS.13.#COMMISSIONING OF THE INSTALLED DELUGE VALVE AND LEAK CHECKING (ANYLEAKAGES/ABNORMALITIES OBSERVED SHALL BE RECTIFIED IMMEDIATELY)14.#THE CONTRACTOR SHALL ALIGN THEIR WORKING HOURS WITH DEWA DUTY HOURSAND SHALL FINISH THE INSTALLATION AND COMMISSIONING ACTIVITIES WITHINDUTY HOURS.15.#HOUSEKEEPING, SCRAP DISPOSAL AND DEMOBILIZATION.16.#TRANSPORT THE REMOVED DELUGE VALVE FROM DEWA L-1 STATION TOCONTRACTOR WORKSHOP.17.#DISMANTLING, CLEANING AND INS PECTION OF VALVE INTERNALS.18.#SUBMISSION OF THE INITIAL INSPECTION REPORT TO DEWA.19.#REMOVAL OF THE EXISTING PAINT COATING FROM TH E VALVE (INTERNAL ANDEXTERNAL)20.#COMPLETE SAND BLASTING OF THE VALVE BODY.21.#PAINTING OF THE VALVE AS PER APPROVED PAINTING STANDA RD.22.#BOX UP OF THE VALVE WITH NEW DIAPHRAGM (BASED ON DIAPHRAGMCONDITION). (DIAPHRAGM WILL BE SUPPLIED BY DEWA).23.#TESTING OF THE VALVE AS PER REQUIRED STANDARD.24.#TEST CERTIFICATE SHALL BE SUBMITTED TO DEWA.25.#EACH DELUGE VALVE SHALL BE PUNCHED WITH A UNIQUE NUMBER AND THESAME NUMBER SHALL REFLECT IN THE REPORT.26.#PROVIDE#ONE-YEAR WARRANTY.27.#DETAILED WORK EXECUTION REPORT SHALL BE SUB MITTED TO DEWA AT THETIME OF DELIVERY ALONG WITH PHOTOS. DETAILED BLASTING, PAINTING ANDTESTING REPORTS SHALL BE INCLUDED IN THE FIN AL REPORT.28.#DELIVER BACK TO DEWA L-1 STORE WITHIN 5 DAYS OF COLLECTION.29.#PREVIOUS SIMILAR EXPERIENCE PO TO BE PROVIDED FROM DEWA OR ANYOTHER WELL-KNOWN COMPANY Qty: 5 Deluge Valve Removal, Refurbishment, Installation and Commissioning, L1Station. Contact Person - Mr Nadeem 04-8140587 / 050 9124804 OR [email protected] / 048140672..SOW enclosed STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2412501633)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
21dda491-c4b8-40b9-9ad9-2c3d6d0ee55c.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.