Fulfillment Of Workplace In The Ground, Group Of Group: 1, Cargo Transportation Of Cargo With Carpets, Which Is 10 Tons Of Carrying Capacity (Code 400052). Transportation Distance - 5 Km. 1St-Grade Load, Excavators With 0.65 (0.5-1) M3 With The Capacity Of 0.65 (0.5-1), Group Of Group: 2 (Ground Now), Treatment Of Ground With Pneumatic Beaters, Group Group: 1, 2, To Add To 01-01-033-02 Norm (10M Shipment) During The 5 M Transport Of The Soil, Grunt Filling Up To 5 M, Filling The Pits And Trenches With Bulldozers: 59 (80) Kw (A.G.), Group 2 Group, The Capacity Of The Clamp Was Thrown Away From The Ground With Foreign Production Excavators With 0.5 (0.5-0.63) M3, Group Of Group: 2, Installing Concrete Bort Stones: In Other Types Of Covers, Handicraft (Lawn) Of The Parter-Shaped, Mauritanese-Shaped And Ordinary Lawn, Installation Of Sidewalks By Filling The Seams Of Concrete Pans: With Cement Solution (Tamet), Coating And The Removal Of The Ground: Cement-Concrete (Tamet-Useless), Coloring Metal Surfaces With Oil Paint: Cages, Layers, Diameter Of 50 Mm And Less Than Ten Pipes, Coloring (Painting The Metal Gate), The Carcasses Of The Gates Raised, Raised, Removed, Great Overhacurred Buildings, Hangars, Etc. Installation Of Gate Carcasses Without Opening Mechanism, Aglay Tiles, Thickness 40 Mm
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.