Part No. I - Renovation Of The Premises Of The District Headquarters Of The State Fire Service In Kędzierzyn-Koźle, In Order To Secure Civil Protection Resources In Crisis Situations: A. Construction Works:1. Renovation Works In The Staircase And Room 05.01 - Making New Cladding Of Steps And Platforms With Ceramic Tiles With A Plinth, - Making A Floor With Ceramic Tiles With A Plinth, - Replacing The Stair Railing With A Galvanized Steel One, Powder-Coated In Ral7016 With A Handrail, - Making A Steel Safety Balustrade, Galvanized, Powder-Coated In Ral7016 On The Landing (Window Recess), - Building A Separating Wall On The Ground Floor With Double-Sided Plastering With Lintels And A Door Opening, - Installation Of Aluminum Double Doors In The Brick Wall, - Replacement Of The Entrance Door To The Garage - Aluminum Double Doors, - Replacement Of Two Wooden Skylights On Pvc With Finished Processing On Both Sides, - Dismantling The Wall Made Of Luxfers And Bricking Up The Hole Left By Luxfers - Reconstruction Of The External Façade With Insulation, - Construction Of Structures On The Walls, Concealing The Installations (Solar, Air Conditioning, Central Heating, Electricity) - Plastering Works After Electrical Works, - Replacement Of Doors To The Basement, - Installation Of A Suspended Coffered Ceiling, - Painting Of Wall Surfaces And Surface Preparation, - Replacement Of Window Sills With Granite Ones, - Installation Of A Ceramic Tile Floor On The Entrance Stairs To The Building And Preparation Of The Substrate.2. Renovation Works In Rooms No. 02, 03, 04 - Removal Of Ceramic Cladding From Walls And Floors, - Dismantling Of Floor Subfloors, - Dismantling Of Partition Walls With Doors In Rooms, - Dismantling Of The Suspended Ceiling In Room 02, - Installation Of A Suspended Coffered Ceiling, - Installation Of New Ceramic Cladding Of Floors With Plinths With Leveling Corridor Level, - Replacement Of The Door To Room 04 With The Construction Of A New Lintel, - Replacement Of Window Sills With Granite Ones, - Plastering Works After Electrical Works, - Installation Of Window Air Vents, - Bricking Up Window Recesses And Wall Recesses, - Laying 45 Mm Thick Protective Rubber Mats In Rooms 02 And 03 On Ceramic Tiles,3. Renovation Works In Room No. 07 - Dismantling The Door With Bricking Up The Opening And Plastering On Both Sides, - Dismantling The Existing Wainscoting, - Plastering Works After Electrical Works - Dismantling The Floor Layers: Parquet And Adhesive Layer And Stairs, - Making A New Cement Floor, - Making A Floor Of Ceramic Tiles With A Plinth Up To The Floor Level On Garage, - Cutting A Hole For The Entrance Door With A Lintel, - Installation Of New Double-Leaf Aluminum Doors, - Replacement Of Window Sills, - Painting Of Wall Surfaces With Surface Preparation, - Installation Of A Suspended Coffered Ceiling, - Installation Of Window Vents, - Installation Of 10 Pieces Of Gray Steel Shelves, Dimensions 200X100x60, With 5 Shelves Load Capacity 100 Kg