GTR 103075474

Tenders Are Invited For Exterior Lights - Implementation Of Energy-Saving Lighting Technologies In The City Of Kolbuszów - Stage: Reconstruction Of Part Of The Street Lighting Cabinets, Related To Adapting The Lighting To Fully Monitor And Control Street Lighting And To Install Reactive Power Compensators Generated By Led Luminaires And Controllers.

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
103075474
Tendering Authority
Subscribe to view
Tender No
662137-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Exterior Lights - Implementation Of Energy-Saving Lighting Technologies In The City Of Kolbuszów - Stage: Reconstruction Of Part Of The Street Lighting Cabinets, Related To Adapting The Lighting To Fully Monitor And Control Street Lighting And To Install Reactive Power Compensators Generated By Led Luminaires And Controllers.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
14-11-2025 Closed
Work Detail
Exterior Lights - Implementation Of Energy-Saving Lighting Technologies In The City Of Kolbuszów - Stage: Reconstruction Of Part Of The Street Lighting Cabinets, Related To Adapting The Lighting To Fully Monitor And Control Street Lighting And To Install Reactive Power Compensators Generated By Led Luminaires And Controllers.. Part I. Removing Street Lighting Cabinets Outside Transformer Stations. The Task Includes The Delivery Of 12 Sou Street Lighting Cabinets, Which Will Replace The Existing Street Lighting Cabinets Located In Transformer Station Rooms, Including Four In Overhead Pole Stations. These Cabinets Will Be Adapted To Implement Full Street Lighting Control In The City Of Kolbuszowa. The Cabinets Will Consist Of A Separate Measurement Part (Main Protection And Electricity Meter) And A Distribution Part With An Appropriate Number Of Three-Phase And Single-Phase Outgoing Fields And Control. All Sou Power Cables And Outflows To Existing Lighting Networks Should Be Made With Yakxs 4X35 Mm2 Earth Cable. The Exit Of Cables From The Main Switchboards - Rg Of Transformer Stations Supplying The New Sous Should Be Led Outside Through Existing Cable Ducts, Which Should Then Be Carefully Sealed And Secured, In Consultation With The Representative Of Pge Dystrybucja. At Intersections With Existing Infrastructure Or Crossings, Appropriate Protective Pipes Φ 75 Mm Should Be Used. All New Sous Must Have An Effective Ground Of ≤ 10 Ω, Connected To The Existing Station Ground. In Places Where Such A Connection Cannot Be Made, Pin Grounding Should Be Made. Fezn 25X4 Mm Tape Should Be Laid In The Trenches; After Extending The Cables, It Should Also Be Extended. Cables In The Sou Should Be Permanently Marked On Markers At The Point Of Entry Into The Sou And At The Joints, As Well As At The Exit From The Rg. Part Ii. Installation Of Active Reactive Power Compensators With Harmonic Reduction In The Form Of An External Cabinet. The Task Includes The Delivery And Installation Of 26 Dynamic Reactive Power Compensators In A Cabinet Form. Complete Compensation Cabinets Will Be Built Next To Free-Standing Sous, With The Exception Of The Power Supply From The Sou At The Kolbuszowa 19 Station. This Compensator Will Be Located Next To The Lighting Pole No. 19/1/9. The Location Of The Compensators Is Shown In Graphic Appendix No. Phases (In A Three-Phase Network), Must Be In The Cabinet Version, Along With Instrumentation And Protection For External Conditions. They Must Be Matched To The Power Of The Existing Led Luminaires And After Replacing The Sodium Luminaires With Led Ones, With A Margin Of + 25%. The Compensator Should Ensure Reactive Power Compensation So That The Tg Φ Is Within The Range 0 - 0.4 (Ind), When Dimming The Luminaires From 100% To 30%. During The Investment Warranty Period, The Compensators Will Be Maintained And Adjusted By The Contractor So That They Fulfill Their Role. The Power Summary For Individual Sous Is Presented In Appendix No. 3. Since The Delivery Of Reactive Power Compensators Is Related To The Replacement Of Sodium And Metal Halide Luminaires With Led Luminaires, The Final Adjustment Of The Compensators May Take Place After The Complete Replacement Of The Luminaires, Which Is Required
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
865c210d-edb7-4466-aefc-77d9e18bc26e.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders