Groundwater Pollution Treatment Or Rehabilitation – Construction And Operation Of A Groundwater Purification Plant. Construction And Operation Of A Groundwater Purification Plant (Gwra) With Extensive Work To Create The Footprint For The New Gwra, Demolition And Earthworks For Laying The Pipes From The Three Production Wells To The Gwra, Construction Of The Drain Pipe To The Property Transfer Shaft, Dismantling Of Old Pipes From The Previous Operation Of The Outflow Protection With Subsequent Groundwater Purification, Operation Of The Gwra To Purify Groundwater Contaminated With Lhkw In A Multi-Stage Treatment Plant, Average Delivery Rate: 6.5 M³/H, Average Lhkw Concentration: 6,500 Myg/L (Myg/L), Monitoring And Limit Values To Be Adhered To: Discharge Of Purified Groundwater With Monitoring Value: 100 Myg/L Total Lhkw, Limit Value: 150 Myg/L Total Lhkw. Discharge Of Cleaned Exhaust Air With Monitoring Value: 1 Mg/M³ For The Sum Of Vinyl Chloride And Trichloroethene, 100 Mg/M³ For Cis-1,2-Dichloroethene, Limit Value: 5 Mg/M³ For The Sum Of Vinyl Chloride And Trichloroethene, 150 Mg/M³ For Cis-1,2-Dichloroethene.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.