Architectural, Engineering And Planning Services - Ferencváros Carriage Partial Development Plan. From 2024, Public Transport In Budapest Wants To Expand Its Fleet By Purchasing 46 Caf 3/5 And 5 Caf 3/9 Modern Low-Floor Vehicles. In Order To Improve Passengers Comfort And Quality Of Service, Developments Should Be Made To Ensure That These New Types Of Vehicles Can Be Safely And Reliable On The Affected Lines. To Provide Adequate Daily Operation, It Includes Proper Storage Of Vehicles, Daily Maintenance Work And The Necessary Technical Improvements, A Significant Part Of Which Is Displayed In The Area Of The Car. The Existing Caf Fleet Is Stored And Maintained By Bkv Zrt. Budafok, Zugló And Sava, But It Can No Longer Serve The Extended Vehicle Fleet At The Same Time From These Sites, So New Sites Need To Be Modified To Provide The Desired Number Of Vehicles. Ferencváros Carriages Are Currently Capable Of Storing And Maintaining Kcsv7 And Tw6000/6100 Trams. The Buildings Of The Car Color Are Under Monumental Protection, But No Historic Inventory Is Yet Prepared. New Caf Trams Arriving In 2025 Require A Different Service Environment Such As Ics-Kcs Or Tw6000/6100 Vehicles; These Are Low -Floor Vehicles Of Different Sizes And Technologies: Different Skeletal Screens And Other Maintenance Conditions. Thus, Cafs Also Require The Installation Of Technologies Needed To Ensure Regular Daily Operation, Which Is Not Suitable For The Site In Its Current Form (For Example, The Placement Of Sand Filler, Washing Equipment, Etc.). Given That Ferencváros Is Under The Protection Of The Carriage, The Design Program Should Be Prepared As Part Of The Design Program For Buildings Affected By The Design And The Protection Documentation Of The Monument. Identification Numbers Of The Facilities Affected By The Conversion: Vehicle Maintenance 30676, Newer Car Color 30724; Older Car Color: 30725; Track 30730. The Following Workflows And Workshops Require: - 1 Concept Plan; - Static Tests; - 1 Monument Protection Documentation And Related Value Inventory; - The Necessary Plans For Plans And Plans For Plans (Customer And Oét Together); - Conducting Official, Ownership, Operator Consultations, Consultations; - 1 Permit And Construction Design Documentation; - Full Obtaining Permits And Contributions; - Cooperations, Conciliations, Reminders, Minutes; - Tkü Plan Package; - Preparation And Acquisition Of All Certificates (Eg Debo); - Organization Plans, Construction Schedule, And Priced And Priced Budget; - Everything Else Is The Document, Plan, Permission, Approval, Certification, Etc. Necessary For The Execution. Acquisition; - Optional Task: Designer Management Tasks (Designing General Tasks Performed
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.