Excavation Of The Waterline And Immersion Of The Water Pipe And Filling The Line Below Annex 2. According To The Map Below Two Meters (Frostbreaker). The Trench Does Not Require A Separate Grate, But The Pipe Can Be Installed Directly In The Basic Country. The Masses In The Calculations Use 2.5M Excavation Depth, So The Tenderer Is Obliged To Calculate The Mass Calculations With New Information Provided. The Tenderer Connects The Pipeline In The Pipeline To The 75Mm Water Pipe Connected To The Bottom Water Tank. Lumijoki Vesi Oy Connects To The Departure End Of The Excavated Pipe To Its Own Network. The Provider Is Obliged To Explore The Terrain Before Submitting The Offer.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.