GTR 102947312
Request For Quotation Ball Valve Line.
ICB — International Competitive Bid
Closed
Central Asia
Tender Information
GTR Reference
102947312
Tendering Authority
Subscribe to view
Tender No
15498254
Financer Name
Self-Funded
Work Title
Request For Quotation Ball Valve Line.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Asia
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
10-10-2025
Closed
Work Detail
3/4 Mounting Set For Bimetallic Radiators. A) The Output Diameter - 3/4ʺ; B) The Type Of Component - A Set For Connecting The Radiator; C) Carvings Of The Jar - 1ʺ; D) Thread For Connecting Radiator Cranes - 3/4ʺ. Requirements For The Supplier. 1. Payment Is Made After The Delivery Of Goods Under The Relevant Acceptance Certificate. 2. The Warranty Period Of The Normal Operation Of The Goods Is Established At Least 12 (Twelve) Months From The Date Of Signing By The Parties To The Acceptance Certificate. 3. The Product Must Be New (Fresh), Previously Not Used. 4. The Deadline For The Supply Of Goods After The Signing Of The Contract On Public Procurement 7 (Seven) Business Days. 5. The Shortcomings And Defects Identified When Accepting The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At His Own Expense. 6. Customer Name: Branch Of The Rgp Nc Kpms Rk Kp Mps Rk Institute Of Mining Named After D.A. Kunaeva. 7. Address Of The Customer: Almaty, Almalinsky District, Ave. Abay, 191., Requirements For The Supplier. The Ppr 25*25*25 Mm Tee, Tap Is Straight. A) Working Pressure - 25 Bar; B) Sdr - 6; . 1. Payment Is Made After The Delivery Of Goods Under The Relevant Acceptance Certificate. 2. The Warranty Period Of The Normal Operation Of The Goods Is Established At Least 12 (Twelve) Months From The Date Of Signing By The Parties To The Acceptance Certificate. 3. The Product Must Be New (Fresh), Previously Not Used. 4. The Deadline For The Supply Of Goods After The Signing Of The Contract On Public Procurement 7 (Seven) Business Days. 5. The Shortcomings And Defects Identified When Accepting The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At His Own Expense. 6. Customer Name: Branch Of The Rgp Nc Kpms Rk Kp Mps Rk Institute Of Mining Named After D.A. Kunaeva. 7. Address Of The Customer: Almaty, Almalinsky District, Ave. Abay, 191., Linear Led Lamp. Length (Mm) - 1200 Width (Mm) - 95 Height (Mm) - 30 Lighting Color - Cool White Color Temperature (In K) - 6400 Power (W) - 120 Voltage (V) - 220-240 Degree Of Protection (Ip) - Ip20 Installation Type - Overhead Switch Type - Wall Color Palette - White Installation Location - Ceiling Dimensions (Lxwxh) - 1200×95×30 Net Weight (Kg) - 0.6 Base Type - Built-In Leds Luminous Flux (Lm) - 10800 Color Rendering Index (Cri) - 0 To 80 Power Supply - Mains Power Product Type - Linear Luminaire Warranty (Years) - 2 Requirements For The Supplier. 1. Payment Is Made After Delivery Of The Goods According To The Relevant Acceptance Certificate. 2. The Warranty Period For Normal Operation Of The Product Is Set At Least 12 (Twelve) Months From The Date The Parties Signed The Acceptance Certificate. 3. The Product Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For The Goods After Signing The Public Procurement Contract Is 7 (Seven) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of The Customer: Branch Of The Rse “Nc Cpms Rk” “Kp” “Mps Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., The Tap Ball American Is Straight. A) The Type Of Shutter - Ball; B) Connection - American; C) Type Of Connection - Coupl; D) Body Material - Brass; E) Coating - Nickel; E) The Diameter Of The Crane - 3/4; Requirements For The Supplier. 1. Payment Is Made After The Delivery Of Goods Under The Relevant Acceptance Certificate. 2. The Warranty Period Of The Normal Operation Of The Goods Is Established At Least 12 (Twelve) Months From The Date Of Signing By The Parties To The Acceptance Certificate. 3. The Product Must Be New (Fresh), Previously Not Used. 4. The Deadline For The Supply Of Goods After The Signing Of The Contract On Public Procurement 7 (Seven) Business Days. 5. The Shortcomings And Defects Identified When Accepting The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At His Own Expense. 6. Customer Name: Branch Of The Rgp Nc Kpms Rk Kp Mps Rk Institute Of Mining Named After D.A. Kunaeva. 7. Address Of The Customer: Almaty, Almalinsky District, Ave. Abay, 191., The Coupling Combined External Thread (Hp) 25X3/4. A) The Type Of Coupling - Combined; B) The Maximum Temperature Of The Working Environment Is 95 ºс; C) Color - White, Gray; D) Working Pressure - 25 Bar; E) The Diameter Of The Ppr For Rations - 25 Mm; E) Diameter Threaded - 3/4 (20 Mm); G) The Material Of The Coupling - Polypropylene + Brass; H) Production Standards - Din 8077, 8078; I) The Working Environment Is A Foul, A Liquid Medium, Water, A Non-Aggressive Environment. Requirements For The Supplier. 1. Payment Is Made After The Delivery Of Goods Under The Relevant Acceptance Certificate. 2. The Warranty Period Of The Normal Operation Of The Goods Is Established At Least 12 (Twelve) Months From The Date Of Signing By The Parties To The Acceptance Certificate. 3. The Product Must Be New (Fresh), Previously Not Used. 4. The Deadline For The Supply Of Goods After The Signing Of The Contract On Public Procurement 7 (Seven) Business Days. 5. The Shortcomings And Defects Identified When Accepting The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At His Own Expense. 6. Customer Name: Branch Of The Rgp Nc Kpms Rk Kp Mps Rk Institute Of Mining Named After D.A. Kunaeva. 7. Address Of The Customer: Almaty, Almalinsky District, Ave. Abay, 191., The Coupling Combined Internal Thread (Bp) Is 25X3/4. A) The Type Of Coupling - Combined; B) The Maximum Temperature Of The Working Environment Is 95 ºс; C) Color - White, Gray; D) Working Pressure - 25 Bar; E) The Diameter Of The Ppr For Rations - 25 Mm; E) Diameter Threaded - 3/4 (20 Mm); G) The Material Of The Coupling - Polypropylene + Brass; H) Production Standards - Din 8077, 8078; I) The Working Environment - Air, Liquid Medium, Water, Non -Aggressive Environment. . Tendering To The Supplier. 1. Payment Is Made After The Delivery Of Goods Under The Relevant Acceptance Certificate. 2. The Warranty Period Of The Normal Operation Of The Goods Is Established At Least 12 (Twelve) Months From The Date Of Signing By The Parties To The Acceptance Certificate. 3. The Product Must Be New (Fresh), Previously Not Used. 4. The Deadline For The Supply Of Goods After The Signing Of The Contract On Public Procurement 7 (Seven) Business Days. 5. The Shortcomings And Defects Identified When Accepting The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At His Own Expense. 6. Customer Name: Branch Of The Rgp Nc Kpms Rk Kp Mps Rk Institute Of Mining Named After D.A. Kunaeva. 7. Address Of The Customer: Almaty, Almalinsky District, Ave. Abay, 191., Nipell Radiator. A) Purpose - For Connecting The Radiator Section; B) Thread Diameter - 1ʺ; C) Material - Steel; D) Type Of Component - A Set For Connecting A Radiator. Requirements For The Supplier. 1. Payment Is Made After The Delivery Of Goods Under The Relevant Acceptance Certificate. 2. The Warranty Period Of The Normal Operation Of The Goods Is Established At Least 12 (Twelve) Months From The Date Of Signing By The Parties To The Acceptance Certificate. 3. The Product Must Be New (Fresh), Previously Not Used. 4. The Deadline For The Supply Of Goods After The Signing Of The Contract On Public Procurement 7 (Seven) Business Days. 5. The Shortcomings And Defects Identified When Accepting The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At His Own Expense. 6. Customer Name: Branch Of The Rgp Nc Kpms Rk Kp Mps Rk Institute Of Mining Named After D.A. Kunaeva. 7. Address Of The Customer: Almaty, Almalinsky District, Ave. Abay, 191., Ball Valve Ppr 25 Mm. Gost 32415-2013. A) Working Environment - Hot Water; B) Maximum Working Temperature - 95 ºс; C) Type Of Connection - Soldering; D) Body Material - Polypropylene; E) Working Pressure - 25 Bar; Requirements For The Supplier. 1. Payment Is Made After The Delivery Of Goods Under The Relevant Acceptance Certificate. 2. The Warranty Period Of The Normal Operation Of The Goods Is Established At Least 12 (Twelve) Months From The Date Of Signing By The Parties To The Acceptance Certificate. 3. The Product Must Be New (Fresh), Previously Not Used. 4. The Deadline For The Supply Of Goods After The Signing Of The Contract On Public Procurement 7 (Seven) Business Days. 5. The Shortcomings And Defects Identified When Accepting The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At His Own Expense. 6. Customer Name: Branch Of The Rgp Nc Kpms Rk Kp Mps Rk Institute Of Mining Named After D.A. Kunaeva. 7. Address Of The Customer: Almaty, Almalinsky District, Ave. Abay, 191.
Key Value
Tender Value
316,460 - KZT
Tender Documents
Global Tender Document
7a715813-8392-441b-ae9e-241bcca79d5e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.