Tenders Are Invited For Boiler Installation Work - Renewal Of A Saturated Steam Boiler System
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
102863985
Tendering Authority
Subscribe to view
Tender No
654004-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Boiler Installation Work - Renewal Of A Saturated Steam Boiler System
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
03-11-2025
Closed
Work Detail
Boiler Installation Work - Renewal Of A Saturated Steam Boiler System. The N-E-Ergie Kraftwerke Gmbh On The Power Plant Of The Sandreuth Heating Station Intends To Renew An Existing Saturated Steam Boiler System In A Performance Class Of 37.5 Mw Combustion Heat Output (2X18.75 Mw) To Cover The Peak And Reserve Load Within The Power Plant. Natural Gas And Heating Oil El Serve As Fuel For The Rich Steam Boilers, And 100% Hydrogen In The Boilers Should Also Be Used As Fuel. The Scope Of Delivery And Services Includes The Complete Dismantling Planning, Dismantling, Removal, Removal For Recycling Or Disposal Of The Old System With The Necessary Evidence And The Associated Documentation And Quality Assurance As Well As The New Construction Planning And Construction Of A New Functional Saturate Steam Boiler System With The Necessary Periphery. With An Operating Pressure Of Approx. 12 Bar (Ü), The Generated Filling Steam Of The New System Should Be Fed Into The Distribution Network Of The Location In Order To Secure The District Heating And Its Pressure Posture From There, To Provide The Blocking Steam For A Steam Turbine And To Be Distributed To Other Steam Levels Of The Location Via Reduction Stations. The Flue Gas From The Saturated Steam Boilers Is Led To A Chimney In The Stock Via A Common Flue Gas System. Another Firing System Is Already Integrating On This Chimney. Furthermore, The Electrical And Control Facilities Connected To The Filling Steam Boiler System As Well As The Technical Building Equipment Of The Building In Existing Building Should Also Be Brought To The Current State Of The Art. The Building Itself Is To Be Used With The Lowest Possible Adjustments.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a81351e7-a4cd-4bca-801a-522bb81390c2.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.