3 Stanisła-Wa Fenrych, Plot Of Land No. 315/57, Rev. 0015 Pudliszki, Commune Krobia, Gostyński Poviat, Greater Poland Voivodeship. 2. The Subject Of The Contract Includes, In Particular: 1) The Implementation Of Comprehensive Multi -Branch Design Documentation, Including The Development Of A Multi -Branch Technical Project To The Extent In Accordance With The Provisions Of The Regulation Of The Minister Of Development Of 11 September 2020 On The Detailed Scope And Form Of The Construction Project (Journal Of Laws 201222.1679), 2) Obtaining All Required Opinions, Agreements And Permits Necessary To Implement The Construction Intention In This Opinion And Arrangements In The Field Of Media Connections To Real Estate, 3) Making An Effective Notification Of Completion Of Construction Works And Obtaining Permission To Use, Including The Implementation Of The Energy Characteristics Of Individual Residential Premises. Multi -Family Residential And Land Development Project, Which Is An Attachment To Pfu.B), Multi -Family Residential Buildings Are Planned As Three -Storey, Non -Basement, Covered With A Flat Roof With An Attic Wall. The Entire Construction Of Buildings In Prefabricated, Large-Panel Technology. One Staircase Was Designed In Each Building, Equipped With A Single-Nourishing Passenger Crane. On The Ground Floor Of Buildings, Two Apartments Are Designed To Take Into Account The Needs Of People With Disabilities. One Place Should Be Brought To A Power Cable Enabling The Installation Of A Power Supply Station To An Electric Car. A Supply Of Water For External Fire Extinguishing Should Be Provided. For Rainwater Collection, A Sealed Underground Tank Or Alternative Solutions Are Expected In The Field Of Rainwater Development. On April 12, 2002 On The Technical Conditions To Be Met By Buildings And Their Location (Journal Of Laws 2012,0.1225), U And Correspond To Separate Regulations, Including Those Regarding Fire Protection, Etc.3. A Detailed Description Of The Subject Of The Contract And The Manner Of Execution Of The Order Is Determined By:- Functional And Utility Program (Hereinafter: Pfu), Building Permit With A Construction Project, Opinions, Arrangements, Constituting Annex 4 To Swz,- Planned Provisions Of The Contract Constituting Annex 5 To Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.