Tenders Are Invited For Reconstruction And Equipping The Place Of Hiding In The Independent Public Health Care Center In Puławy.

Tender Detail

102761471
ZM 59/230/2025
Self-Funded
Tenders Are Invited For Reconstruction And Equipping The Place Of Hiding In The Independent Public Health Care Center In Puławy.
NCB
central europe
European Union
16-10-2025

Work Detail

3 A Detailed Description Of The Subject Of The Contract Is Determined By A Functional And Utility Program Constituting Annex 5 To The Specification Of The Terms Of The Contract, Hereinafter Referred To As (Swz) And The Material And Quantitative Statement Of Equipment Constituting Annex 6 To Swz.3. Requirements For The Conditions For The Performance Of Construction Works. In Particular, The Following Conditions Should Be Followed By The Performance Of The Subject Of The Contract: 1) The Works Will Be Carried Out Inside The Active Object. The Sanitary Regime Should Be Particularly Observed. Performing Works May Not Interfere With The Functioning Of The Object. The Contractor Will Adapt The Most Burdensome Activities To The Organization Of Work In The Facility. 2) All Works Related To The Implementation Of The Investment Intention In Question Should Be Carried Out In Accordance With Technical Knowledge, Manufacturers Instructions, Technical Conditions For Execution And Acceptance Of Works For Individual Industries, Polish Standards, Health And Safety Regulations, Fire Protection. And Construction Law, Under Strict Supervision And Management Of Authorized Persons. 3) To Perform Works Being The Subject Of The Contract, Use Materials, Products And Devices That Are Suitable For Use When Performing Construction Works Within The Meaning Of The Act Of 16.04.2004, About Construction Products (Journal Of Laws Of 2004 No. 92 Item 881, As Amended). In The Event Of Brands Or Trademarks In Documentation, The Employer Allows Equivalent Materials Or Devices, I.E. Technical, Quality And Utility Parameters Not Worse Than Those Indicated In The Documentation And Not Conducting Technology. The Names Indicated In The Documentation Should Be Treated As Examples All Elements Included In The Description And Not Included In The Drawings Or Included In The Drawings, And Not Included In The Description, Should Be Treated As If They Were Included In Both.6) The Implementation Of Possible As -Built Documentation, Measurements And Arrangements Lies At The Discretion Of The Contractor. Contractor Of The Subject Of The Contract With The Applicable Health And Safety Regulations. The Liquidation Of A Failure That May Cause A State Of Danger To Life, Health And Property Of The Contracting Authority Causes The Need To Purchase Materials, The Contractor Is Obliged To Buy Them To Perform The Work Protecting The Failure Until The Repair Work Joins. 12) The Contractor Is Obliged To Secure The Construction Site. 4. In The Event That In A Detailed Description Of The Subject Of The Contract, Standards, Trademarks, Patents, Origin, Source Or A Special Process, Characterizing Specific Products Or Services Were Indicated, This Means That The Contracting Authority Could Not Describe The Subject Of The Contract With The Help Of Sufficiently Accurate Terms And This Is Justified By The Specificity Of The Subject Of The Contract. In Such Situations, Possible Indications Of Norms, Trademarks, Patent

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document a00b059d-37b4-42da-b18c-b6b9317cfedd.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail