GTR 102761112
Tenders Are Invited For Replacement Of Lighting Fittings In The City Of Chorzów
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
102761112
Tendering Authority
Subscribe to view
Tender No
ZP.26.1.19.2025.AB
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Replacement Of Lighting Fittings In The City Of Chorzów
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
09-10-2025
Closed
Work Detail
Part 1 Of The Order - 75 Infantry Regiment And On Ul. Nomiars - Subject Of The Order - For Part 1 Of The Order - Includes In Particular: A) Dismantling Of Existing Sodium Fixtures Of Street Lighting On Ul. 75 Of The Infantry Regiment And The Family Of St. Floriana- 22 Pcs On 21 Poles; B) Dismantling Of Existing Sodium Luminaires Street Lighting On Ul. Nomiars And The Roundabout Of Womens Rights - 22 Pcs On 18 Columns; C) Utilization Of Dismantled Lighting Fittings - 38 Pcs. 75 Of The Infantry Regiment And The Family Of St. Floriana - 22 Pcs - Lighting Fixtures On Ul. Nomiars And The Womens Rights Roundabout - 22 Pcs. E) Delivery And Assembly Of The Interact City Lighting Lighting Lighting Control System: F) Configuration Of The Street Lighting Control And Management System At The Ordering Partys Headquarters; G) Launching The Modernized Installation Along With The Execution Of The Necessary Electrical Measurements And Lighting Measurements; H) Training/Instruction Indicated By The Persons Indicated By The Employer In The Field Of Service Of The Lighting Control System; I) Development Of As -Built Documentation In The Required Scope With Catalog Cards Used Lighting, Results Of Intensity Calculations, Uniformity And Luminance Of Lighting, Declarations Of Conformity (Certificates) Used In The Implementation Of The Products Of The Products, I.E. Lighting Luminaires, Controllers, Cables, Insulating Firm Connectors, And Insulating Fuse Connectors, Insulating Fuse Connectors, Insulating Fuse Connectors Izk, Etc. 4. A Detailed Description Of The Subject Of The Contract And The Manner Of Processing The Order For A Given Part Of The Contract Is Presented In Annex 1 To This Swz And In The Planned Provisions Of The Agreement Constituting Annex 3 To Swz.5. Notes Regarding The Implementation Of The Subject Of The Contract: 1) Throughout The Duration Of The Contract, The Contractor Is Responsible For The Completed Construction Site, Securing The Place Of Works, Maintaining Temporary Marking, Cleanliness On The Roads And Pavements Both In The Area Of The Works Carried Out As Well As Access Roads For Construction. The Contractor Is Responsible For The Safety And All Damage To Third Parties Resulting From The Works. 2) The Contractor Is Obliged To Provide Access And Reach Buildings Throughout The Entire Period Of Works. 3) The Contractor Is First Of All The Obligation To Undergo Waste Generated During The Implementation Of The Recovery Agreement, And If For Technological, Ecological, Economic Or Other Reasons With An Objective Nature - The Contractor Is Impossible - The Contractor - The Contractor He Is Obliged To Donate The Waste For Disposal. The Waste Referred To In The First Sentence Is The Property Of The Ordering Party. 4) The Contractor Will Make An Inventory Of The Resulting Waste With The Participation Of The Employer For Individual Completed Stages Of Works Specified In The Schedule. During The Inventory, A Joint Assessment Of The Usefulness And Possib
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7e5cae21-4c43-47bb-aab2-ddae03a76379.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.