GTR 102693770
Quotation Are Invited For Fabrication And Clamping For Online Sealing Of Steam Line Leaks At Desal
ICB — International Competitive Bid
Closed
Asia
Tender Information
GTR Reference
102693770
Tendering Authority
Subscribe to view
Tender No
2332502503
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Fabrication And Clamping For Online Sealing Of Steam Line Leaks At Desal
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
06-10-2025
Closed
Work Detail
Quotation are invited for Fabrication and Clamping for Online Sealing of Steam Line Leaks at Desal Fabrication and Clamping for 1032504709 FABRICATION AND CLAMPING FOR ONLINE SEALING OF STEAM LINE LEAKS AT DESAL 1 ITEM-00001 ONLINE LEAK CLAMPING AND SEALING IN MP STEAM 1# LINE AT DESAL 45.THIS WORK WILL BE DONE WITHOUT ISOLATION OF THE SYSTEMPRESSURE IS A PPROX. 19 BAR.CONTRACTOR SCOPE: ALL MATERIALSDEWA SCOPE: WATER AND AIRCONTACT JAMES KUMAR PHONE: 04-80-25255 MOBILE: +971529126512MA IL: [email protected]. CONTRACTOR SHALL PROVIDE, SKILLED, SEMI-SKILLED, UNSKILLED WORKFORCE, ALL REQUIRED EQUIPMENT,TOOLS, CO NSUMABLES ETC. REQUIRED TO CARRY OUT TO COMPLETE THE WORKSUCCESSFULLY.B. CONTRACTOR SHALL ALWAYS USE ALL PERSONAL PROTECTIVE EQUIPME NT ANDFIRST AID KIT AVAILABLE AT SITE DURING SITE VISIT AND CLAMPING OF WORKS.C. CONTRACTOR SHALL PROVIDE THE MOST APPROPRIATE METHO D STATEMENT, WORKSCHEDULE AND RISKASSESSMENT AND GET APPROVAL FROM CONCERNED DEWA ENGINEERS PRIOR TOCOMMENCEMENT OF WORK.D. THE CONT RACTOR SHALL POSSESS A VALI THIRD-PARTY INSURANCE ANDWORKMEN#S COMPENSATION FOR ALL WORKS AND PERSONNEL INVOLVED UNTIL THEWORKS ARE TAKEN OVER BY THE COMPANY IN WRITING. COPIES OF THE SAME TO BESUBMITTED ALONG WITH QUOTATION.E. THE CONTRACTOR SHALL SUBMIT A MASTER PROGRAM COVERING THE FULL SCOPETHIS CONTRACT PRIOR TO COMMENCEMENT OF HIS WORK. EXTENSION OFCONTRACTOR#S WORKING TIME BEYOND DEWA#S NORMAL DUTY TIME SHALL BEGRANTED FURTHER TO THE APPROVAL OF CONCERNED DEWA ENGINEER.F. IT IS THE RESPONSIBILITY OF THE CONTRACTOR T O HAVE HIS N ARRANGEMENTIN EXTENDING THE ELECTRICITY AND WATER UTILITY TO THE WORK LOCATIONS.THE CONTRACTOR, HOWEVER, IS REQUIRED TO FURNISH IN ADVANCE HISREQUIREMENT OF POWER AND WATER WITH FULL JUSTIFICATION CONTRACTOR SHALLNOT WASTE, OR MISUSE FACILITIES PROVI DED BY DEWA.J. STRICTLY ALWAYS ADHERE TO THE SAFETY AND SECURITY PROCEDURES OF DEWADURING THEIR PRESENCE AND WHILE WORKING IN THE DE WA PREMISES.CONTACT:JAMES KUMARMAIL # [email protected]: 04-80-25255 MOBILE: +971529126512 2 ITEM-00002 ONLINE LEAK CLAMPING AND SEALING IN LP STEAM 2# LINE AT DESAL 45.THIS WORK WILL BE DONE WITHOUT ISOLATION OF THE SYSTEMPRESSURE IS A PPROX. 2 BAR.CONTRACTOR SCOPE: ALL MATERIALSDEWA SCOPE: WATER AND AIRCONTACT JAMES KUMAR PHONE: 04-80-25255 MOBILE: +971529126512MAI L: [email protected]. CONTRACTOR SHALL PROVIDE, SKILLED, SEMI-SKILLED, UNSKILLED WORKFORCE, ALL REQUIRED EQUIPMENT,TOOLS, CON SUMABLES ETC. REQUIRED TO CARRY OUT TO COMPLETE THE WORKSUCCESSFULLY.B. CONTRACTOR SHALL ALWAYS USE ALL PERSONAL PROTECTIVE EQUIPMEN T ANDFIRST AID KIT AVAILABLE AT SITE DURING SITE VISIT AND CLAMPING OF WORKS.C. CONTRACTOR SHALL PROVIDE THE MOST APPROPRIATE METHOD STATEMENT, WORKSCHEDULE AND RISKASSESSMENT AND GET APPROVAL FROM CONCERNED DEWA ENGINEERS PRIOR TOCOMMENCEMENT OF WORK.D. THE CONTR ACTOR SHALL POSSESS A VALI THIRD-PARTY INSURANCE ANDWORKMEN#S COMPENSATION FOR ALL WORKS AND PERSONNEL INVOLVED UNTIL THEWORKS ARE T AKEN OVER BY THE COMPANY IN WRITING. COPIES OF THE SAME TO BESUBMITTED ALONG WITH QUOTATION.E. THE CONTRACTOR SHALL SUBMIT A MASTER PROGRAM COVERING THE FULL SCOPETHIS CONTRACT PRIOR TO COMMENCEMENT OF HIS WORK. EXTENSION OFCONTRACTOR#S WORKING TIME BEYOND DEWA#S NORMAL DUTY TIME SHALL BEGRANTED FURTHER TO THE APPROVAL OF CONCERNED DEWA ENGINEER.F. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE HIS N ARRANGEMENTIN EXTENDING THE ELECTRICITY AND WATER UTILITY TO THE WORK LOCATIONS.THE CONTRACTOR, HOWEVER, IS REQUIRED TO FURNISH IN ADVANCE HISREQUIREMENT OF POWER AND WATER WITH FULL JUSTIFICATION. CONTRACTOR SHALLNOT WASTE, OR MISUSE FACILITIES PROVID ED BY DEWA.J. STRICTLY ALWAYS ADHERE TO THE SAFETY AND SECURITY PROCEDURES OF DEWADURING THEIR PRESENCE AND WHILE WORKING IN THE DEW A PREMISES.CONTACT:JAMES KUMARMAIL # [email protected]: 04-80-25255 MOBILE: +971529126512 1 EA 1 EA STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332502503)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
56480b78-2d62-4bdd-96eb-84d7fe055d5e.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.