GTR 102691989
Tenders Are Invited For Purchase And Delivery Of Equipment And Individual Equipment For Population Protection Entities Under The National Population And Civil Defense Program For 2025-2026
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
102691989
Tendering Authority
Subscribe to view
Tender No
IGK.271.5.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Purchase And Delivery Of Equipment And Individual Equipment For Population Protection Entities Under The National Population And Civil Defense Program For 2025-2026
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
08-10-2025
Closed
Work Detail
Purchase And Delivery Of Equipment And Individual Equipment For Population Protection Entities Under The National Population And Civil Defense Program For 2025-2026 1. The Subject Of The Contract Is The Delivery Of New Personal Protective Equipment, Flood Equipment And Support Equipment (Technical / Medical), Intended For Entities Carrying Out Tasks In The Field Of Civil Protection And Civil Defense. Rescue And Firefighting, Evacuation, Medical And Flood. The Scope Of The Order Includes: 1) Pants - 50 Pcs. 2) Waterproof Jackets Type Sztormiak - 50 Pcs 3) Flood Dams - 10 Pcs. 4) Aed Defibrillators - 15 Pcs The Supplied Assortment Must Be Brand New, Free From Defects, Made Of Materials That Meet The Safety And Health Protection Requirements, And Have The Required Certificates And Declarations Of Compliance. Each Of The Order Elements Should Meet The Minimum Requirements Indicated In The Specification Of The Terms Of The Contract (Swz), Contained In Annex 1 - Description Of The Subject Of The Contract - Minimal Requirements. 5. The Contracting Authority Requires The Contractor To Grant A Minimum Guarantee Of 12 Months For Personal Protective Equipment (Waters, Coats / Rain Jackets), Minimum 12 Months For Flood Equipment (Flood Sleeves), Minimum 12 Months For Support Equipment (Aed Defibrillators, Heaters). 6. The Warranty And Warranty Period Begins: 1) The Following Day After Signing The Non-Adhesive Delivery And Acceptance Report Of The Subject Of The Contract, 2) In The Event Of Replacement Or Repair Of The Element-From The Date Of Replacement/Repair. If The Manufacturers Warranty Is Shorter Than Declared In The Offer, The Contractor Is Obliged To Grant The Own Guarantee Of Supplementary To The Declared Period. To Confirm Compliance With The Requirements, The Contractor Submits A Statement On The Warranty And Warranty Period. 7. The Detailed Specification Is Determined By The Description Of The Subject Of The Contract Constituting Annex 1 To Swz - Minimum Requirements.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d86149f7-8fef-4e8d-9656-1de5e580558a.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.