1. The Subject Of The Order Are Construction Works Involving The Construction Of Gravity And Translation Sanitary Sewage Network With A Total Length Of 3,114.00 Mb In Warsaw And Partly Within The Town Of New Jawór (Channel A, B, Ba, Ba, G, G, H, H, H, H, Hb). The Drainage Of Sewage From The Above -Mentioned Area Is Planned By Including In The Existing Sanitary Sewage System Located On Plot No. 275 Located In The Town Of Warsaw, Through Which The Sewage Will Be Discharged To The Sewage Treatment Plant In Pawłów. The Total Length Of The Designed Gravity Sanitary Sewage System Is 2 250.50 Mb, The Total Length Of The Designed Sanitary Sewage Network The Transmission Is 863.50 M There Is No Change In The Existing Function Of The Area. The Construction Of The Sewage Network As A Linear Investment Does Not Cause The Need To Change The Shape And The Method Of Developing The Area Of The Area. It Is Not Required To Change The Purpose Of Agricultural And Forest Land. The Sanitary Sewage Network Has Been Adapted To The System Of Main Communication Routes As Well As The Current And Planned Development Of Plots. In Connection With The Construction Of A Sanitary Sewage System, There Will Be Liquidation Or Secured By Existing Drainage Tanks, Previously Used As A Home Septic Tanks. The Need To Liquidate Or Secure Drainage Tanks Lies With The Owner Of The Property. The Process Of Implementing The Construction Of A Sanitary Sewage System Is Obtained By The Ecological Effect In The Form Of: Ordering Sewage Management, By Removing Sanitary Sewage To The Sewage Treatment Plant In A Manner Organized And In Accordance With The Regulations; Maximizing Ecological Effects, Consisting Of Obtaining As Many Connections As Possible To The Sewage System; Improving The Sanitary Condition Of The Town By Cutting Off Any Existing Outflows Of Sanitary Sewage To Watercourses, Surface Waters And Roadside Ditches, And By Eliminating Home -To -Expensive Resource Reservoirs /Samb/.W In The Scope Of The Project, Technical Solutions Have Been Included In The Field Of Design Of External Sanitary Sewage Networks. The Scope Of Construction Works Covered By The Investment Includes, Among Others: Main Gravitational Channels, Gravitational Side Channels, Main Discharge Pipelines, Network Sewage Pumping Stations Ps-1, Ps-5, Ps-6, Internal Power Supply Lines For Supplying Network Sewage Pumping Stations, Land Use. Disassembly Of The Old Water Meter, Installing A New Water Meter, Replacement Of Gaskets, Sealing The Water Meter On The Connector In Front Of The Water Meter With A Plastic Band With A Number. The Water Gauge Will Be Equipped With Communication Modules That Allow You To Send Data On Water Consumption Directly To The Building Management System Or To The Users Application. Thanks To This, It Will Be Possible To Monitor Consumption Without The Need For A Physical Reading Of The Meter. The Total Amount Of Water Meters For The Replacement Is 1636 Pcs (Including In The Village Of Brzezie -
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.