GTR 102526028
Quotation Are Invited For Gas Turbine Piping Integrity Inspection At Phase1, 2 & 3, H-Station
ICB — International Competitive Bid
Closed
Asia
Tender Information
GTR Reference
102526028
Tendering Authority
Subscribe to view
Tender No
2332502449
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Gas Turbine Piping Integrity Inspection At Phase1, 2 & 3, H-Station
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
01-10-2025
Closed
Work Detail
Quotation are invited for Gas Turbine Piping Integrity Inspection at Phase1, 2 & 3, H-Station, Al-Aweer. THE SCOPE OF THIS ASSIGNMENT IS TO CARRY OUT INTEGRITY INSPECTIONSERVICES FOR VARIOUS PIPING (2# AND ABOVE) CONNECTED TO GAS TURBINE S AT#H# STATION, AL-AWEER. THE FOLLOWING GAS TURBINES ARE INSTALLED ATH-STATION, AL AWEER, DUBAI.1.6 MITSUBISHI M701D UNITS (PHASE 1 )2.3 SIEMENS V94.2 UNITS (PHASE 2)3.4 SIEMENS V94.3 UNITS (PHASE 3)A.GENERAL REQUIREMENT:1.THE PURPOSE AND MAIN OBJECTIVE OF THIS EN QUIRY IS TO APPOINT ANINDEPENDENT AND COMPETENT INTEGRITY INSPECTION SERVICE PROVIDER HAVINGTHE CAPABILITY AND EXTENSIVE PAST EXPERT ISE IN PIPING INTEGRITYMANAGEMENT RELATED TECHNICAL AND COMMERCIAL STUDIES AND ASSESSMENT.2.DEWA WISHES TO APPOINT A REPUTED CONTRAC TOR HAVING EXPERIENCE ININSPECTION, VERIFICATION, TESTING AND CERTIFICATION TO PROVIDE SUPPORT,MAKE RECOMMENDATIONS AND ADVISE DEWA TO ENHANCE ITS PIPING MANAGEMENTWITH A FOCUS ON PRESSURE CONTAINMENT INTEGRITY MANAGEMENT.3.THE CONTRACTOR SHOULD HAVE VALID LICENSE UNDER DUBAI MUNICIPALITY TOSUCH TYPE OF INSPECTION. CONTRACTOR SHOULD HAVE WORKMAN COMPENSATIONINSURANCE, INSURANCE FOR MEN AND MAT ERIALS4.THE CONTRACTOR SHALL PROVIDE INTEGRITY MANAGEMENT PLANS (IMPS) FORPIPING AND PIPELINES AS DEFINED ELSEWHERE.5.THESE IMPS WIL L ENHANCE DEWA#S ABILITY TO SAFELY MANAGE DEWA SYSTEMSIN COMPLIANCE WITH DEWA HSE POLICY.6.THE CONTRACTOR SHALL DEVELOP AND IMPLEMEN T RISK BASED INSPECTION (RBI)APPROACH AND THE ASSET INTEGRITY SERVICES FOR #H# STATION GAS TURBINEPIPING (2 INCH & ABOVE) IN ORDER T O FURTHER STRENGTHEN THE ASSETINTEGRITY MANAGEMENT PROGRAM BASED ON RISK ASSOCIATED WITH STATICEQUIPMENT.7.THE EXECUTION OF THE WORK SHALL BE CONSIDERED IN FOUR PHASES ASFOLLOWS:PHASE-1. DEVELOPMENT OF INTEGRITY MANAGEMENT PLAN (IMP) AND INSPECTIONTEST PROTOCOL B Y ADOPTING RISK BASED INSPECTION METHOD AS PER API-580.PHASE-2. IMPLEMENTATION OF INTEGRITY MANAGEMENT PLAN (IMP).PHASE-3. EVALUATIO N OF INSPECTION DATA AND REMAINING LIFE ASSESSMENTPHASE-4. FITNESS FOR SERVICE ASSESSMENT (FFS)B.PIPING P&IDS INCLUDED IN INTEGRITY INSPECTION WORK SCOPE.1.PHASE-1; CONTROL OIL SYSTEM- S1-616642.PHASE-1; COOLING AIR & COMPRESSOR BLADE WASHING SYSTEMS1-616683.PHA SE-1; FO & SWEEP AIR SYSTEMS1-616674.PHASE-1; LUBE OIL SYSTEMS1-616655.PHASE-1; NG SYSTEMS1-616666.PHASE-1; PURGE AIR SYSTEMS1-617897.PHASE-2; FUEL OIL & BURNER PURGE WATER SYSTEM(CNE/121/2004/B/21/M/R/52318 & 52319 & 52320 & 52321 & 52306)8.PHASE-2; HYDRA ULIC OIL SYSTEM- (CNE/121/2004/B/21/M/R/52315 & 52311 &52312 & 52313 & 52309)9.PHASE-2; LUBE & LIFT OIL SYSTEM- CNE/121/2004/B/21/M/ R/52303 & 52304 &5231410.PHASE-2; NATURAL GAS SYSTEM- CNE/121/2004/B/21/M/R/5230111.PHASE-3; FUEL OIL, PURGE WATER & PNEUMATIC FOR O IL-CNE/200/2005-B-09-M-R-00562 (SHEET 1 TO 6) & 00571 (SHEET 1 TO 2) &00560.12.PHASE-3; NATURAL GAS SYSTEM- CNE/200/2005-B-08-M-R-00 55113.PHASE-3; HYDRAULIC OIL SYSTEMCNE/200/2005-B-21-M-R-3552714.PHASE-3; LUBE & LIFT OIL SYSTEMCNE/200/2005-B-23-M-R-00564(SHEE T 1TO 2) & 0055415.COOLING WATER SYSTEM FOR ALL THE GAS TURBINES- P&ID DRAWING WILL BEPROVIDED AT THE TIME OF SITE INSPECTION.C.#DET AILED WORK SCOPE:1.#CONTRACTOR TO GET FAMILIAR WITH SITE CONDITIONS & COMPLETE SCOPE OFWORK PRIOR SUBMITTING THE OFFER TO UNDERSTAND COMPLETE WORK SCOPE INDETAIL. A PREBID SITE VISIT CAN BE REQUESTED BY EMAIL [email protected] / [email protected].# THE INTEGRITY MANAGEMENT PROVIDER SHALL COLLECT ALL THE NECESSARYAVAILABLE DOCUMENTS FROM DEWA.3.#DEVELOPMENT OF THE INSPECTION TEST PROTOCOL (ITP) TO IMPLEMENT IMPAND TO COLLECT NDE DATA ON PRESENT CONDITION OF THE ASSET UNDER STUDY.4.#A FINAL RBI ASSESSMENT REPO RT WILL BE PRESENTED BY THE CONTRACTOR.ALL RESULTS OF ANALYSIS WORK AS WELL AS RECOMMENDATIONS ARE DOCUMENTED.5.#THE ACTUAL SCOPE OF WORK FOR THE NDT TECHNIQUES AND CML LOCATIONSWILL BE FINALIZED BASED ON RBI STUDY AND DEVELOPMENT OF INTEGRITYMANAGEMENT PLAN AND T EST PROTOCOL.6.#THE GENERAL SCOPE OF INSPECTION SHALL INCLUDE BUT NOT LIMITED TO THEFOLLOWING:A) Qty: 6 Gas Turbine Piping Integrity Inspection at Phase1, 2 & 3, H-Station, Al-Aweer. Scope of Work attached A Prebid site visit can be requested by email to [email protected] / [email protected] STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332502449)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b2b29f0d-aedc-45d1-9b79-4191ce574f0d.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.