GTR 102292387
Tenders Are Invited For Construction Of The Orlik 2024 Sports Complex In Zrębin
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
102292387
Tendering Authority
Subscribe to view
Tender No
TI.271.254.2025.TIB-3
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of The Orlik 2024 Sports Complex In Zrębin
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
08-10-2025
Closed
Work Detail
1. The Subject Of The Order Is The Construction Of Two Pitches With Artificial Surface Along With The Accompanying Infrastructure In The Town Of Zrębin On Plot No. 1188. 2. The Order Should Be Completed In Accordance With: A) Technical Documentation, B) Technical Specification Of The Performance And Receipt Of Construction Works Stwiorb, C) The Material Scope Of Works - Order, 3. Works 4. The Attached Material Scope Of Works - Orders - Is Auxiliary. 5. All Works Should Be Carried Out In Accordance With Applicable Standards, Construction Art, Health And Safety Regulations, Fire Protection. 6. After The Works Are Completed, The Area Of The Plot As Well As The Adjacent Area Should Be Brought - To The Proper State, Ordering The Construction Site. 7. The Basic Conditions And Requirements Regarding The Implementation Of The Task In Question: A) The Contractor May, In No Way Rely On The Possible Omission Of Some Works In The Bill Of Quantities Provided By The Employer, Which Are Only An Auxiliary Nature, And Their Content Cannot Be The Basis Of Any Claims. The Basis Of The Order Is Design Documentation And Other Tender Documents Creating Swz, And The Remuneration Is A Flat -Rate Nature, The Definition Of Which Is Determined By Art. 632 Of The Civil Code. B) If A High Level Of Groundwater Occurs, The Contractor Is Obliged To Ensure Continuous Dehydration Of Earth Excavations At His Own Technology At The Offered Price Of A Flat -Rate Task, C) The Contractor On His Own And At His Own Expense Will Perform Geodetic Support For The Task, Including As -Built Inventory, By The Authorized Surveyor In Accordance With Applicable Regulations, The Contractor Is Responsible For Full Control Of The Work And Quality Of Works And The Quality Of The Materials Used To Perform Their And Their Subcontractors, E) Materials And Devices Supplied To Build In The Process Of Investment Implementation, The Contractor Is Obliged To Present Approvals, Technical Approvals Or Other Equivalent Documents, F) The Contractor At His Own Expense Will Be Obliged To Properly Organize The Construction Site, G) The Contractor On His Own And At His Own Expense Secures All Media, H) The Ordering Party Prohibits The Use Of Harmful Material For The Environment. Materials That Do Not Meet The Requirements Will Be Removed From The Construction Site At The Contractors Expense, I) The Contractor Is Obliged To Secure The Stored Materials, Tools And Equipment Against Destruction, Damage, Theft, And Threat To Bystanders. 8. The Employer Allows The Approach To The Offer, And Then The Use Of Other Materials And Devices Than Those Given In The Description Of The Subject Of The Contract, Provided That Parameters Are Not Worse Than Those Specified In This Order. In Such A Situation, The Employer Requires The Submission Of Relevant Documents, Credible That These Materials And Devices Correspond To The Described By The Ordering Party. 9. In The Event That In The Description Of The Subject Of The Contract There
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
baa641ce-0a64-4f7b-968a-3f31feab9f8a.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.