GTR 102137761
Tenders Are Invited For Architectural Services For Buildings - Jahnstadion (Energetic Renovation Of The Entrance Buildings), Object Planning Buildings
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
102137761
Tendering Authority
Subscribe to view
Tender No
613058-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Architectural Services For Buildings - Jahnstadion (Energetic Renovation Of The Entrance Buildings), Object Planning Buildings
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
20-10-2025
Closed
Work Detail
Architectural Services For Buildings - Jahnstadion (Energetic Renovation Of The Entrance Buildings), Object Planning Buildings. The Subject Of The Order Are The Architectural Services Required To Implement The Project To The Performance Image Of Object Planning Buildings In Accordance With Section 34 (1) Hoai With The Corresponding Service Phases, As Well As The Special Service Of The Incorporation Into The Planning Bases Created For The Funding Application (Building Illustration, Description Of The Project, Energy Concept). This Includes The Necessary Coordination Of Everyone Involved In The Planning And Construction Work. In Large Parts, The Buildings Are To Be Recreated To The State Of The Shell In Order To Create A Good Starting Point For The Rebuild, To Remedy Existing Damaged Spots And To Create The Basis For A Long Additional Lifespan. The Facades And Roofs Must Be Insulated, As Are The Basement Blankets. All Windows And Doors Are Renewed. It Is Intended To Provide All Facades With A Uniform Clinker Bowl That Is Both Durable, As Well As Low -Maintenance And Insensitive To Vandalism. The Heat Supply Must Be Ensured By Installing A Brine Water Heat Pump That Supplements The Entire Ensemble, Supplemented By A Highly Efficient Ventilation System With Heat Recovery. All Existing Lines Are Renewed, The Heat Distribution Is Insulated And Surface Heating Is Installed. An Extensive Green Area And Use Of The Roof Surfaces For Electricity Extraction With A Pv System Are Planned On The Multi-Storey Changing Buildings. Only Energy-Saving Led Lighting, As Well As Measuring And Control Technology For Energy-Efficient Operation, Must Be Installed. The Current Heat Consumption Corresponds To 226,500 Kwh/A, Which Is Produced By A Gas -Powered Heating System. The Electricity Consumption Corresponds To Approx. 13,700 Kwh/A (Status Of Consumption: 2021). Both Consumption Must Be Significantly Reduced By The Renovation And Installation Of Modern Building Technology. The Aim Of The Renovation Measures Mentioned Is To Operate The Buildings Almost Climate -Neutral After The Renovation.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c97ace9c-e7bd-4c6c-98b2-5c574dd54a23.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.