Boiler Installations - Mura Street - Gas Boilers And Their Auxiliary Equipment. On Behalf Of Székesfehérvár Building And Heat Supply Ltd. (Hereinafter: Széphő Zrt.), A Concept Plan Was Prepared In 2024 To Examine And Select The Applicability Of The Energy Sources For The Creation Of The New District Heating Area On Mura Street. According To The Ownership Decision, The First Phase Of The New Heat Area Fitting Into The System Of 1 100-120 Kw And 2 470-510 Kw Standing Condensation Gas Boilers, 3 5M³ Volume Heat Storage Containers And 1 3M³ Replacement Water Tank In The Planned Mechanical Room, Power Solar Panel Field Is Placed. In Order To Provide Flue Gas Drainage In The Location Of The Boilers, 2 Insulated Dn300/400 And Dn110/210 Chimneys With A Height Of 12.00 M Are Fitted To The Western Facade, Included In A Lattice Frame Structure. Detailed Quantities Can Be Learned From The Planned Priced Budget, Technical Information And Annexes.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.