Electrical Wiring And Fitting Work – E_02 Elektrotechnik. The New Building Is A Solid Building With Flat Ceilings, With Load-Bearing Partitions Inside And Reinforced Concrete Supports/ Or Walls With A Preceded, Ventilated Wood Element Facade. The Outer Walls And The Floor Slab In The Underground Are Built From Reinforced Concrete. In This System, For School Operations, Low-Voltage Installations, Lighting, Search And Signal, Danger Systems, Data And Transmission Networks, Smoke And Heat Extraction Systems, As Well As Heavy Current And Telecommunications, Are Built. - Self -Power Systems Central 1St - Self -Centering System Survate - Self -Powered Systems 380St - Low Voltage Switching System Av 8St - Low Voltage Switches Pv 2St - Power Distributor 10St - Laying Systems Trade 2,000M - Cables And Cables Straight Current 13,000M - Cables And Lines Weak Current - Cables 9,000M - Smoke And Smoke Heat Deduction Systems 5St - Bos Radio System Center 1St - Bos Cable And Lines 2,000M - Access Control System Central 1St - Access Control System Elements 180St - Data Distributor 11St - Data Server Distributor 4St - Data Lines 58,000M - Lighting Systems Individual 2,000Th - Lighting Meters 950M - External Lighting - External Lighting Wall 65 Hours
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.