Project Valle Hovin . Description Water And Wastewater Agency (Vav) Plans To Establish A New 400 Mm Water Line Under Ring 3/E6 At Valle Hovin. A Weakness Has Been Identified In The Wiring Network In The Pressure Zone 150 Between 400 Mm Cord Over The Wolf And 400 Mm Cord Over Valle And Helsfyr. By Connecting The Wiring Grid Here, A Strengthened Redundancy And Supply Security Is Achieved In This Part Of The Pressure Zone 150. It Is Planned To Tunners Under Ring 3/E6 To Establish A Dn 1600 Mm Goods Pipes In Concrete. Through The Goods Pipe, A New Water Pipeline On Dn 400 Mm Will Be Drawn To Interconnate Two Measuring Zones. In Order To Carry Out Tunneling, There Will Be A Need To Establish Two Drilling /Reception Groups, One On Each Side Of The Road. Geotechnical Design Of Tunneling (Under Ring 3/E6) Shall Be Carried Out By The Contractor. Complete Design Report Will Be For Independent Control At Multiconsult. A New Measurement Basin Will Be Established On The East Side Of Ring 3. From That Basin, New Dn 400 Vl Is Laid In The Road/Walkway And Connected To The Existing Dn 400 Vl. Existing Drainage Lines Located In The Same Ditch With The Water Line Should Be Rescheduled. At The Intility Arena, On The West Side Of E6/Ring 3, New Dn 400 Vl Is Connected To The Existing Dn 400 Water Pipeline At Kum 366648.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.