1. The Subject Of The Order Settled In A Lump Sum Is: Autumn And Winter Maintenance Of Order And Cleanliness In Real Estate Owned By The Company And Ownership Of The City, Managed By Zakład Gospodarki Mieszkaniowej Towarzystwo Budownictwo Społecznego Sp. Z O.O. Ul. Cieślaka 6B In Szczecinek2. The List Of Areas Is Included In Annexes No. 1, No. 2, No. 3, No. 4 To This Swz. 3. The Area Of The Total Area Is - 84,758.83 M2, Including: A) Courtyards 13 411.64 M2 B) Stores Of Pavements Inside The Housing Estate 9 092.91 M2 C) Access To Buildings 1 453.83 M2 D) Green Areas (Lawns) 43 562.60 M2 E) Parking And Roads 14 031.21 M2 F) There Are Garbage Containers And Access To These Containers 3 206.64 M2 4 Cleansing From All Uncleanness Of Roads, Pavements, Reach Buildings, Trash Fees And Other Hardened Areas, 3) Raking/Leaf Removal And Fallen Branches From Trees, 4) Cleaning The Property, Garage Complexes, Trash Challengers, Basement Pouring, And Squares Large -Size (In Periods Between Large -Size Waste Collection) With Branches, Debris, All Kinds Of Construction And Sanitary Waste (Panels, Window Frames, Boards, Beams, Fences, Bathtubs, Sinks, Shower Trays, Toilet Shells, Rinses, Mirrors, Radiators, Glaze, Terracotta Etc.) And Other Waste And Other Dirt, 5) Emptying In The Supported Areas Of Housing Estate / Street Baskets With A Frequency Of Min. Min. 2 Times A Week (Monday And Friday) And On A Regular Basis In The Case Of Overflow (Approx. 30 To 36 Pcs), 6) Removing Snow And Ice And Sprinkling With Sand Or Other Allowed For Use, In Order To Prevent Slipperyness And Ensuring Safe Conditions For Moving Vehicles And Pedestrians On The Roads, Parking Lots, Pavements, Driveways For Disabilities, Stairs To Buildings (From Pages Of Street And Property) And Access To Buildings, Garages And Dustbins (Also When The Access Surface Is Not Separated From The Surface Of E.G. A Yard Or Lawn), By: A) Ensuring All The Materials Needed To Combat Winter Slippery, Whose Adequate Amount Should Be Collected Before The Start Of The Winter Season, B) Removing Night Snowfall Until 6:00 Am, C) Removal Of Snowfall In The Daytime, I.E. From 6:00 To 22:00 Within 2 Hours After The End Of The Rainfall, D) Removal Of Ice And Winter Slippery Formed At Night - Until 6:00 In The Morning, E) Removal Of Ice And Winter Slippery Formed In The Daytime, I.E. 6:00 To 22:00 Immediately After Its Inception, F) Cleaning Up Mud, Snow, Ice And Other Impurities From Pavements, Stairs, Driveways For The Disabled And Reaching Buildings And Dustbins At Least Once A Day, G) Cleaning Of Pavements, Stairs And Driveways For The Disabled And Reaching Buildings From Sand Or Other Approved For The Use Of The Measure Used For The Liquidation Of Dumps, 7) Sandbox Sand And Its Replacement In April (About 10 Sandboxes), 8) Waste Management In Accordance With The Legal Provisions In Force In This Respect