Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
22-09-2025
Work Detail
Quotation are invited for AMC Water Quality Analyzer Amc Water Quality Analyzer 1032504355 1 ITEM-00001 ANNUAL MAINTENANCE CONTRACT7 FOR NUMBERS S::CAN ON LINE WATER QUALITYANALYZER SYSTEM AT VARIOUS LOCATIONS RESIDING IN PUMPING STATI ON ANDRESERVOIRS.SCOPE OF WORKS.Ø#THE INSTALLED WQA (REFER BOQ ATTACHED) NEEDS TO DO THE QUARTERLYPREVENTIVE MAINTENANCE AND SHOULD BE SUBMIT THE PM CHECKLIST AS PER DEWASTANDARD.Ø#EVERY THREE MONTHS REQUIRED CALIBRATION OF INSTALLED WQA WITH OEMRECOMMENDATION AND ISSUED THE CALIBRATION CERTIFICATE AS PER DEWASTANDARD.Ø#ATTEND AND RECTIFY ANY CORRECTIVE AND CALIBRATION ACTION REQUIRE FORINSTAL LED WQA ON AN URGENT BASIS.Ø#REPLACE THE SENSOR MEMBRANE CAP AND ELECTROLYTE SOLUTION OF CLO2/CL2SENSOR FOR ALL 07 ANALYZERS EVERY 3 MONTHS OR WHENEVER IS NEEDED ALSO.(THESE MENTIONED CONSUMABLES ARE UNDER AMC CONTRACTOR SCOPE ONLY)Ø#REPLACING/CLEANING THE INLET F ILTER (Y- STRAINER) FOR CLEAR SAMPLEWATER LINE.Ø#SYSTEM UPGRADE AND FIRM WARE UPGRADATION WHENEVER REQUIRED.Ø#ALL EMERGENCY CALLS S HOULD BE ATTEND AND RECTIFY ANY LEAKAGE IN THESYSTEM AND REPLACE ALL WATER TUBES AS REQUIRED.Ø#WATER SAMPLING LINE SHOULD BE PROVIDE D BY THE CONTRACTOR AS PERMANUFACTURER RECOMMENDATION AND APPROVAL FROM DEWAØ#CALIBRATION PROCEDURE SHOULD BE SUBMITTED TO DEWA FOR REVIEW ANDAPPROVAL.Ø#SHOULD BE USE DPD & PORTABLE HANDHELD METER WITH THIRD PARTYCALIBRATION CERTIFICATE AS PER DEWA APPROVED LIST F OR CALIBRATIONACTIVITY.Ø#SHOULD BE USE BUFFER AND STANDARD SOLUTIONS FOR CALIBRATION ACTIVITYAS PER AS PER DEWA APPROVED LISTBOQSL N O #LOCATIONS#DECIMAL DEGREE COORDINATES - N#DECIMAL DEGREECOORDINATES - E#TAG NUMBER #1# HATTA PHASE 3 P/S (R372P)#24.84897#56.0 21621# #2# LUSAILLY NEW RESERVOIR (R377S1)#24.928948#55.484446#3# GHAFATH RESERVOIR ( R378RV)#24.995485#55.271805# #4# MUSHRIF P/S ( R119P)#25.191887#55.449993# #5# DSO P/S (R451P)#25.125377#55.374704# #6#NAJMA P/S ( R07P)#25.128623#55.253582# #7#HABAB PHASE 1 P/ S ( R82P)#24.977337#55.138173# #NOTE-FOR ANY CLARIFICATION PLEASE CONTACT MR. ABHILASH BABU ON 050/4743525AND HAMAD MAHMOUD KARRANI ON 055/6424227 2 ITEM-00001 2ND QUARTER MAINTENANCE FOR 7 NOS. WATER 1 EA 3 ITEM-00001 3RD QUARTER MAINTENANCE FOR 7 NOS 1 EA 4 ITEM-00001 4TH QUARTER MAINTENANCE FOR 7 NOS. 1 EA 1 EA STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332502328)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.