Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services - B5 Od Treplin - Construction Management, Local Construction Monitoring And Factual Examination Of The Supplements
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services - B5 Od Treplin - Construction Management, Local Construction Monitoring And Factual Examination Of The Supplements
Architectural, Construction, Engineering And Inspection Services - B5 Od Treplin - Construction Management, Local Construction Monitoring And Factual Examination Of The Supplements. 1. Center Of The Tender 1.1. General Description The Construction Work Is Located In The Brandenburg District Of Märkisch Oderland In The Village Of Treplin. The Aim Of The Construction Work Is A Fundamental Expansion Of The B 5, Which Is To Be Carried Out In Half -Sided Construction. In Addition To The New Construction Of The Street, The Drinking Water Pipe And The Sewage Pipe Are Renewed By The Water Supply And Wastewater Disposal Fürstenwalde And The Surrounding Area In The Construction Site. Other Components Of The Construction Work Are The Construction Of 5 Traffic Islands, The Expansion Of 3 Bus Stops, As Well As The Construction Of A New Storage Space Channel, A Passage And A Sedimentation System. The Construction Work Is Carried Out On Half -Sided In 10 Different Traffic Sections. 1.2. Statements On The Monitoring Construction Measure The B 5 Is Fundamentally Expanded Over A Length Of Approx. 744 M. This Expansion Takes Place Under Traffic, Which Results In A Higher Coordination Effort. Furthermore, Arrangements Must Be Made With Regard To The New Building Of The Drinking Water Pipe With The Purpose Association Of Water Supply And Wastewater Disposal Fürstenwalde And The Surrounding Area. In Addition To Road Construction, A Walking Cycle Path Is Arranged On One Side, Sections On The Opposite Side Of The Road. Due To The Coordination Of Third Parties, A Higher Coordination Effort Can Be Expected. Furthermore, A Higher Coordination Effort For The Coordination Between The Individual Traffic Sections Must Be Calculated. 2. Processing Basis/ State Of Planning. The Construction Work Begins According To The Current Planning Status In December 2025 And Are To Be Completed In August 2028. When Creating Your Offer, The Aforementioned Period Plus The Time For The Reservations Without Reservations Must Be Taken Into Account By The Contractors Construction. The Performance Is To Be Offered At One Month Before The Start Of Construction And Three Months After The End Of The Construction. You Can Find Further Information Due To The Sign Limitation In The Service Description.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.