Structural Shell Work-Blb Nrw Duisburg / Uedem / Radar Position Marienbaum / Shell Construction / 020-25-00429. Essential Positions: - Construction Site Direction - Earthwork: Creation Of The Construction Pit (Building Pit Sole Approx. 450M2, Excavation Depth Approx. 2.00 M From Ok Pavement) - Drainage Work: Creation Line Trenches, Excavation Depth Up To 1.25 M ,: 45 M3 - Masonry Work: View Masonry External Wall: 330 M2 Including The Production Of Openings - Creation Stair Tower From Stamiler Concrete: Base Plate 75 M2, External Wall 1,360 M2 Up To 36.5 M Height Including Door And Window Openings, Broken Breakthroughs / Core Holes, Finished Part Stairs As Well As Two Cantilever Panels At Approx. 30 M Height - Reinforcement Work: Approx. 100 T Steel - Insulation And Sealing Work On The Newly Created Tower - Creation Of Assembly In The Newly Created Tower: 600 M3 Up To 30 M Height
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.