This Work Includes The Supply Of All Labour, Materials, Equipment And Services Required To Complete The Construction Of The Mill Creek Trestle Bridge And Culvert Replacement.The Work Includes, But Is Not Limited To The Following:1. Mobilization And Demobilization2. Road Closures3. Traffic Accommodation And Staging4. Work Site Management Including Temporary Construction Facilities, Security, And Protectionof Existing Utilities5. Water Management6. Environmental Protection During All Stages Of Construction7. Excavation – Structural And Channel8. Removal And Disposal Of Existing Structures9. Cip Piling10. Supply And Installation Of Heavy Rock Riprap11. Abutments12. Girder Erection13. Backfill - Granular And Non-Granular14. Approach Slab Concrete Pour(S)15. Installation Of Bridge Rail, Guardrail And Impact Attenuator16. Timber Trestle Bridge Complete With Concrete Foundations17. Roadway Removals18. Roadway Subgrade Grading19. Roadway Granular Base Grading20. Bridge And Roadway Asphalt Concrete Paving21. Naturalization22. Topsoil And Seeding23. Work Site Cleanup24. Warranty And Maintenance
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.