Concrete Work - Mhh - K06 - Bu Package Ii - Trade: Concrete Work Stone Work. The Project Management Gb Vi Department Is Commissioned To Implement The Measure Of Fire Protection Renovation, 2Nd Level - Building K6 - Bu Package 2. According To The Expert Evaluation Of 2016, There Are Risks In The Building K06, In Particular For The Protection Goals, The Rescue Of People And Disability The Spread Of Fire And Smoke. The Protection Goals According To §14 Nbauo Have Not Been Fully Achieved After The Sbh Commissioned Fire Protection Expert Wijnveld, And There Is A Need For Action. With Reference To The New Version Of Rlbau 2024, Section C, To Number 1, It Is A Measure To Ensure The Functionality Of The K6 Existing Building, Which Is To Be Implemented In The Context Of Building Entertainment. Investive Structural Measures Are Not Included In The Scope Of Measures. With Reference To The Securitized Statements Of The State Construction Management Or The Fire Protection Expert Commissioned By The Sbh, The Fastest Possible Action Without Culpable Delay Is A Basic Requirement For The Further Use Of The Bed House K6 And Thus Serves To Ensure The Clinic Company. The Plans For The Bu Package 2 Are Based On The Reading Version Of The Hu Building Created By Sbh And Accompanied By The Nlbl To The 2Nd Level Of Fire Protection Renovation (Kennzenziffer 0619 131) Created By The Sbh And Accompanied By The Nlbl. The Specific Sub-Measures In Bu Package 2 (Node A+C) Have Been Restructured In Coordination With The Fire Protection Expert Iker Lanvers. The Aim Is To Compensate For The Vertically One-Way Elevator In The Nodes A+C In Such A Way That The Emergency Services Situation Is Significantly Improved. Furthermore, In Anticipation Of The Bu Package 3, A Few Measures Are Preferable In The Areas Of The Levels H0, S0 And U0 Affected By The Nodes A+C. The Technically Departure Rlt/Msr Centers At Level 09, Blocks 1-3, Must-Analogously To The Upgrading Of The Rlt/Msr Headquarters In Block 4 As Part Of The Bu Package 1 And To Integrate Into The Existing Alarm And Monitoring System In Terms Of Fire Protection. The Fire Protection Measure Must Be Continued With The Bu Package 2 As Soon As Possible And Without Culpable Delay. With This Award Procedure, The Services For The Trade Stone Work Are Advertised. The Following Services Are Essentially To Be Provided: Construction Site Equipment, Preparatory Work, Concrete Stone, Grouting, Hourly Rates.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.