Installation Of Suspended Ceilings - Rescue Station Herbolzheim - Drywall Work. A New Joint Rescue Center Is Being Built For The Fire Brigade And Drk Herbolzheim. The New Building Is Planned With Two Floors (Eg And Og) And Is Not Under Cellar. The Rescue Center Is Assigned To Building Class 3. In The Northwest, A Rescue Tower With Several Exercise Balconies Is Planned For Practice Purposes. The Main Access Is On The South Side Of The Building. The Main Traffic Is Closed Via Westendstrasse And Sh-Allee On The South Side Of The Building. In The Event Of An Alarm, The Rescue Vehicles Of The Volunteer Fire Brigade And The Rescue Station Move Out To The North Over The Alarm Exit To Rheinhausenstrasse. In The Area Of Rheinhausenstrasse, An Entrance Is Also Planned For Returning Emergency Vehicles. Gri Overall (R+S) 17,419.68M³ Bgf Total (R+S) 3,482.77M² Nuf-Total (R+S) 2,527.17M² 039 Drywalls Wall: Gipkarton Metal Stand Walls In Different Thicknesses And Heights, Double Planned, Filling Q2, Depending On The Requirement Of Noise Protection And Fire Resistance, Partly In Inhibitory Fire. In Wet Areas Partially Cement Building Boards. Ceilings: Suspended Ceilings With Plasterboard And Metal Uk. Fire Protection Ceilings Made Of Metal, Room Final F30
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.